CASE STUDY: Transformer fault detection and repair followed by degassing monitored with online DGA
ENR Construction
AUGUST 17, 2017
The paper discusses a case study on a 400 MVA 400/120/21 kV transformer, installed and commissioned in a 400/110 kV transmission substation in Finland in 2003.
Let's personalize your content