article thumbnail

Expansion, Relocation Projects Bringing Las Vegas Area Over 700 Jobs

Business Facilities

Seeking a business-friendly environment, video monitoring company Virtual Guard is looking to relocate from Los Angeles to the Las Vegas area. Founded in Nevada in 2003 and now offering the largest product line in North America, Xtreme Manufacturing is a leading manufacturer of heavy equipment and construction machinery.

article thumbnail

Why Projects Fail

Job Order Contracting

In doing so, owners will be displaying appropriate leadership as well as stewardship of the built environment. Linkages of Project Environment to Performance: Lessons for Team Leadership?, PROBLEMS CAUSED BY MANAGMENT FAILURE AND LOW ORGANIZATIONAL MATURITY. Project management is changing, and it’s changing fast. 1 and 2, pp.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Keen Work Boots for Men and Women

Work Gearz

Fabricated with Nubuck leather for the uppers, the outsole is in thick high-quality rubber offering lots of grip and sturdiness. In 2003, this boot company was named by Footwear News’ as the “Launch of the Year” and since then has continued striving to better its own excellence levels in producing work boots.

Detroit 52
article thumbnail

Top 10 Water Tank Brands in India

CivilJungle

fabricate custom made storage tanks perfectly fitting the location and capacity criteria of our clients and carry out professional installation within the stipulated time frame. 2003: Commissioned our 3rd unit at Vijayawada, Andhra further enhancing our wings. R C Plasto has been an industry leader in plastic product fabrication.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. It is also defined as the total cash flow of the project from the conceptual stage to the disposal stage (Bennett, 2003). Life cycle analysis takes into account the capital costs of the project as well as costs of operation and maintenance.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. Labs 21 National Conference 2012 – “High Performance Healthcare Environments: Metrics and Procedures”. . . Steve Hunt , Dee Cramer. .

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. 10:00 – 11:30 AM Construction – Fabrication Integration. Labs 21 National Conference 2012 – “High Performance Healthcare Environments: Metrics and Procedures”. . . Steve Hunt , Dee Cramer. .

BIM 40