Remove 2004 Remove BIM Remove Management Remove Modeling
article thumbnail

Behind the Build: Interview with Mostafa Saber, BIM & Design Manager at Diamond Developers

Autodesk Construction Cloud

We sat down with Mostafa Saber , BIM & Design Manager at Diamond Developers as he walked us through his career journey, the challenges he faces while modernising and his vision for the future of construction. I started my career as an architect in my home city, Cairo, Egypt in 2004. Check out our conversation below!

BIM 119
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. BIM is the life-cycle management of the built environment supported by digital technology. While Value Management is used as term in this paper, it is arguably interchangeable with Capital Planning and Management (CPMS).

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: Kitchen Equipment - RW Smith BIM Booklet

Revit OpEd

Kitchen Equipment - RW Smith BIM Booklet. The company recently finished up their BIM Services booklet hosted by Issuu. I can see why, polished presentation as well as high quality modeling work. Labels: BIM , content , Contractor , Plugs , Vendor. Blog Listing - BIM and Misc. ► 2004. (2). Revit OpEd.

Revit 71
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Friday: BIM Academic Education Symposium.

BIM 45
article thumbnail

Revit OpEd: Wall Floor Interaction and Linked Models

Revit OpEd

Wall Floor Interaction and Linked Models. When we have architecture and structure in separate Revit models we end up with somewhat clumsy graphics in wall sections. This is more pronounced if the structural slab is in the structure model only. It's a little easier to manage than reveals. Blog Listing - BIM and Misc.

Revit 53
article thumbnail

OMNICLASS vs. UNICLASS / UNICLASS2 – BIM Ontology

Building Information Management

These would then need to map to each other and to the Work Results Table, in order to properly integrate the specification component of the building information model (BIM) along the project timeline. Project management. Group 00 Project management + Management Table. Table 5 illustrates this (left-hand column).

BIM 40
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

The efficient life-cycle management of the built environment will not happen until change management is accelerated. Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Friday: BIM Academic Education Symposium.

BIM 40