Remove 2006 Remove BIM Remove Documentation Remove Modeling
article thumbnail

Definition of BIM – Building Information Modeling – Defintions from Various Sources

Building Information Management

‘Building Information Modelling (BIM) is digital representation of physical and functional characteristics of a facility creating a shared knowledge resource for information about it forming a reliable basis for decisions during its life cycle, from earliest conception to demolition.” ” – RICS.

BIM 63
article thumbnail

BIM Strategy for the Built Environment

Building Information Management

Key Considerations for a Successful BIM Strategy. Phasing – Impossible to Implement BIM all a once. as individual drawings, could all be produced directly from the model as a “view” of the required information.” – RICS. Organizational Resources. Economic Fit. Generate and Assess Alternatives – Corrections.

BIM 49
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What drives what…BIM as an enabler?

DebunkTheBIM

One very much-liked claim of BIM promoters is that BIM enables designing architects to be better at what they do. They often use Frank Gehry, the poster boy of the ‘brilliantly creative’ as an example of someone that made those whimsical, awkwardly beautiful buildings he is famous for, purely thanks to BIM.

BIM 50
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Symposium Title: Integrating BIM: Moving the Industry Forward. Friday: BIM Academic Education Symposium. Day(s)/Date(s): January 7-11, 2013.

BIM 45
article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Symposium Title: Integrating BIM: Moving the Industry Forward. Friday: BIM Academic Education Symposium. Day(s)/Date(s): January 7-11, 2013.

BIM 40
article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. The fundamental issue in the LCC is the determination of the operation and maintenance costs of all possible alternatives which are then discounted to present worth of money (Pasquire and Swaffield, 2006) for analysis. Cohen, et al., DISCUSSION.

article thumbnail

Productive Construction – Traits of Collaboration

Job Order Contracting

AIA Document C195 – 2008, Standard Form Single Purpose Entity Agreement for Integrated Project Delivery, Exhibit D (Work Plan). How To Measure the Benefits of BIM: A Case Study Approach. Integrated Project Delivery: A Normative Model For Value Creation In Complex Military Medical Projects. Learn more? contact-form]. doi: [link].

Products 200