article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

article thumbnail

Current and Future Use of BIM – 2013 – UK

Building Information Management

The majority of BIM use remained in the design, procurement and planning stages and as such, only isolated current impacts on the CM were suggested. Eastman suggested the use of integrated databases and standardized drawings to aid in project control (Eastman, Teicholz, Sacks & Liston 2008).

BIM 65
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Best of NAHB’s International Builders’ Show 2023

Pro Builder

Best Home Software Product BILT by BILT Inc. Finalists for the award category include: Higharc's Procure and CertainTeed's NO-COAT PRO. Related: The Best of NAHB’s International Builders’ Show 2022 In its biggest builders' show since 2008, IBS 2023 received more than 400 entries for the Best of IBS Awards.

article thumbnail

Revit OpEd: RTC Europe Site and Details are Live Now

Revit OpEd

Unlock the potential of BIM to streamline the building procurement and construction process. Content and Software Developers. ► 2008. ► December 2008. (16). ► November 2008. (17). ► October 2008. (35). ► September 2008. (49). ► August 2008. (34). at 8:00 AM.

Revit 61
article thumbnail

Veterans Administration – Facilities Management – Audit of Business Practices

Building Information Management

LEAN construction delivery implementation would provide cost transparency, shorter construction project timelines, a higher percentage of funds spent on actual construction vs. procurement/red tape, higher quality, and greater over facility use satisfaction. billion in FY 2013.

article thumbnail

DoD FSRM, BUILDER SMS and the LEGACY of Wasteful Politics

Job Order Contracting

The United States: Bid Protest; DOD’s Sustainment Management System; Subject Matter Jurisdiction; Standardization Decision; Distributed Solutions; Definition of Procurement,” Filed October 21, 2014, [link] show_public_doc?2014cv0173-62-0. released and first version commercially available 2003: NAVY funds development of BUILDER 3.0 (web-based

Defense 134
article thumbnail

OMNICLASS vs. UNICLASS / UNICLASS2 – BIM Ontology

Building Information Management

This means that the Table can’t properly serve design-build and design-build-operate procurement (which, in the latter case, typically requires the contractor to be involved from the very beginning of the project, as part of a consortium). OmniClass Table 22 Work Results 2011 & SectionFormat 2008. See Table 5. *. Conclusion.

BIM 40