SETTING OUT OF FOUNDATION TRENCHES
The Constructor
NOVEMBER 15, 2011
4) The position of cross walls should be measured along the main walls and squared from these wails if desired, the total width of trenches being carefully outlined. 4) The position of cross walls should be measured along the main walls and squared from these wails if desired, the total width of trenches being carefully outlined.
Let's personalize your content