Remove Architecture Remove Budgeting Remove Education Remove Life Cycle
article thumbnail

LEAN Asset Life-cycle Management – Achieve Optimal Construction Outcomes

Job Order Contracting

Optimal construction outcomes such as 90%+ of project on-time and on-budget and 96% satisfaction levels are achieved daily, however, by less than 5% of all real property owners, contractors, architects and engineers. of all construction projects are actually delivered on-time and on budget. The net result is 2.5%

article thumbnail

Best Value Facilities Repair, Renovation Work Order Delivery

Job Order Contracting

An integrated planning, procurement, and project delivery solution that drives consistent on-time, on-budget, quality outcomes at a fair price. All parties can visualize project and work order requirements at a granular level and drive efficient life-cycle management. Collaborative design for constructibility.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Much has been documented about how AECOO (architecture, engineering, construction, owner, operator) sector has been technology adverse when compared to manufacturing, healthcare, education, and virtually every other public and private category. Owner Leadership and LEAN Construction Procurement and Project Delivery Save Time and Money.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges. INTRODUCTION.

article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

As a result, staggering levels of economic and environmental waster are common across the architectural, engineering, construction, operations, and owner groups. There are currently at least three proven LEAN methods relevant to this discussion: Life-cycle total cost-of-ownership modeling and management. Job Order Contracting.

article thumbnail

LEAN Construction in the Public Sector

Job Order Contracting

This simply cannot occur until Owners become competent in Collaborative LEAN Construction Delivery Methods and associated life-cycle management of the built environment. Thus the issue is not the unavailability of solutions, but rather the level of education and awareness across the AECOO sector.

article thumbnail

Construction Cost Estimator – Line Item

Job Order Contracting

An experienced construction cost estimator knows this, but is it is surprising how few estimators practice these techniques. A unit price book and a common data architecture are critical to improving transparency and productivity. Higher Education. State Government and/or K12 Education. Transportation (Airports/Mass Transit).