article thumbnail

Estimating- The New Normal

Chianelli Estimating

Most likely none of the cost factors now required will have been budgeted for on previously awarded contracts and the list is formable; controlled access to sites, material delivery disruptions, temperature checks, two week quarantine, reduced labor force – both in the field and in the office, material shortages. cost overruns.

article thumbnail

Elio Motors Announces Vehicle Manufacturing Facility In Shreveport, LA

Buisness Facilities Contributed Content

The Elio Motors manufacturing facility will occupy approximately 1 million square feet of the more than 3 million-square-foot, former GM site. Industrial developer Stuart Lichter, who has acquired other former GM sites, will buy the 530-acre Shreveport site in conjunction with Elio Motors and lease portions of the site to other tenants.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Road to Recovery in Detroit

Buisness Facilities Contributed Content

The manager will determine what he can salvage from a legacy of decline that has left Motown on the cusp of bankruptcy. Cerberus, an equity player who had acquired a majority stake in Chrysler from German auto giant Daimler-Benz in 2007, went into bankruptcy in 2009. automaker from going the way of the dinosaurs.

Detroit 51
article thumbnail

Completed Operations: A Contractor’s Guide to Coverage, Cost, & More

Levelset

Contractors often buy completed operations insurance because it protects them from costly repairs after they have finished a project and are no longer on site. The general liability portion protects the contractor from damages incurred while the contractor is on-site or at their warehouse or office. not in progress).

article thumbnail

The experts have spoken: We can and should be optimistic despite COVID-19

Lets Build

“It’s really important to maintain good lines of communication and to collaborate with each other and try to find solutions out of this situation rather than to try and gain any kind of commercial advantage,” underlined Chris Hallam, Partner at CMS UK. Find out more: How to manage your construction sites during and after COVID-19.

article thumbnail

Vaughan Buckley on Restarting a Former Katerra Factory

Pro Builder

So it's a little different than trying to redesign a site-built building. VB: I don't think we're going to see a lot more of it in the site construction world. The reason being that the impact on site construction is just simply not as drastic. On a job site I just don't see it happening.

article thumbnail

constructionattorneyblog: New York court holds that contractor.

Construction Lawyer

The cases with which he has been involved are varied and wide-ranging and include personal injury, breach of contract, criminal defense, commercial disputes, and consumer fraud. You should consult an attorney licensed in your jurisdiction before using any of the information contained at this site.   Chapeau filed bankruptcy.