Texas Appellate Court Affirms Grant of Governmental Immunity From Suit Seeking Delay Costs

Constructlaw

Triple B issued a change order for $515,000 in “cost impacts, delays, and disruptions,” stemming from its removal of utility lines not identified in the bid documents. Triple B filed suit, alleging that the city breached its contract by failing to timely pay Triple B for owner-caused delays.

Texas 52
article thumbnail

Data Analytics Trends in Construction

Viewpoint Construction Technology

Injuries, safety inspections and other information must be recorded and in some cases submitted to the Occupational Safety and Health Administration. Bidding Smarter and Winning More Work. Bidding Smarter and Winning More Work. Transitioning from Analytics to Predictive Analytics.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

They ensure everyone is on the same page from the get-go, on topics as diverse as how change orders how the chain of communication will be handled on site. They also try to identify special considerations and forestall potential areas of complication that can lead to change orders.

article thumbnail

An Introduction to Job Order Contracting

Job Order Contracting

Change orders easily increased project costs by 50% or more, and claims and litigation were the norm, versus the exception. JOC contractors strive for: • Fast Delivery • High Quality • No Change Orders • No Warranty Hassles • Maximize budgets. Adapt and expand OpenJOC Program to your changing needs.

Contract 100
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

A Job Order Contract Execution Guide is a required element for any successful, best management practice JOC Program. The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. the time of award.

Contract 100
article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Sometimes, the project won’t pass inspection, or it will need to be torn down due to safety and health concerns. 2: Thoroughly Document Mistakes. If possible, make sure to document the mistake visually with photos. Construction mistakes can be costly, dangerous and impact future project bids.

article thumbnail

Setting up a Job Order Contract

Building Information Management

A listing of potential JOC documents and document templates and associated reporting requirements provides some insight as to what goes in to setting up, or standing up a JOC program. The following is a listing of JOC documents/document template that conceivably might be involved. Advertisement for Bids.