Remove BIM Remove Consulting Remove Employment Remove Modeling
article thumbnail

BIM is dead, please do not resuscitate!

DebunkTheBIM

If there are similar rules for establishing viable crops of BIM around the global AEC industry, they’re better be longer than 30 years. Even a decade or so ago, I could see that BIM was nothing like an emerging success story. May I call them BIM-doom-deniers?

BIM 68
article thumbnail

How ITC Reduces Construction Disruptions and Delays With Digital Transformation

Autodesk Construction Cloud

Without this clear vision, they faced the regular risk of complications during construction and escalating costs driven by evolving changes and reworks by project stakeholders and consultants. Initially, ITC looked to Autodesk’s products and 5D VDC’s expertise for the external landscape development modelling work for the ITC Rajarhat Campus.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The future of specifiers: The way forward

Construction Specifier

Will the role grow and change in the future or will it disappear completely in favor of a new model? They see trends toward integrating information better, both with building information modeling (BIM) and drawings, and between teammates. How can we encourage other professionals to take an interest in the role?

CSI 97
article thumbnail

For one of the many HK contractors that have been caught up in the 65Bim MTR BIM experiment* here is a chance to redeem themselves!

DebunkTheBIM

MMA offers this opportunity to any/all contractors unsure about the risks they had taken on when they entered these BIM-weighted contracts to manage those risks wisely and get themselves back onto their ‘front foot’ with the MTR.

BIM 53
article thumbnail

Should building owners be asking for ‘performance-based’ or ‘prescriptive’ BIM?

DebunkTheBIM

During my involvement with BIM I’ve had the privilege to set the BIM framework for a number of building projects. In retrospect I wish I’d more often based those documents on the principle described in the following paragraph: This project is required to be fully delivered using BIM.

BIM 48
article thumbnail

Is Two D from Two D still cheaper than Two D from Three D?

DebunkTheBIM

Should documentation that is based on a coordinated 3D digital model be charged at a higher price than straight CAD-ed one is? Should a client have the right to choose one over the other without wanting to pay for a full blown BIM? Not to talk about if the practice (2D based 2D) should still exist, at all.

CAD 48
article thumbnail

BIM 101 for Andrew Hayward; Balfour Beatty plc: Head of Ethics, Risk and Assurance

DebunkTheBIM

On Sunday, August the 25 th this year, within this blog I published the third instalment of the story I like to refer to as the ‘HK MTR BIM experiment’. An external consultant was hired to assist with the implementation of this non-complying BIM and engaged over a lengthy period of time. · Missed and/or ignored. ·

BIM 48