LEAN Job Order Contracting – What Public Sector Facilities Professionals Need to Know

Job Order Contracting

Job Order Contracting (JOC) has been distorted into a way to simply speed the procurement of repair, renovation, and new build construction, bypassing procurement rigors and doing little to assure mutually beneficial benefit to owners and design-builder or overall efficiency. Full financial and technical visibility and transparency.

Contract 220
article thumbnail

Job Order Contract Roles and Responsibilities

Job Order Contracting

JOC Procurement/Purchasing/Contracting Authority. The Real Property Owner and an assigned Contracting, Procurement, Purchasing Authority should be the SIGNING AUTHORITY for any JOC task order/project, with appropriate authority/co-signature of the Owner’s assign Technical Authority (from Facilities Management, DPW, Engineering, etc.).

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

The J OCPB (JOC Price Book: reflects the current local costs in detail for construction tasks expected to be performed in the geographical area of the base contract with the primary use of developing a detailed line-item price. This is a national average cost book that DOES NOT REFLECT LOCAL COSTS. 5117.9001 Definitions.

Contract 226
article thumbnail

JOC TASK ORDER Process Overview – USACE

Job Order Contracting

Each stage in the JOC task order process is designed to assure collaboration on an early and ongoing basis, clearly communicate a detailed scope of work, and manage all aspects of construction planning, procurement, and project delivery. Sample Task Order Proposal – Overview (not showing detailed unit price line items).

article thumbnail

JOC Contractors

Job Order Contracting

JOC contractors, can you currently… Shorten the project development and procurement time, Provide reliable and controlled construction, Consistently meet or exceed the needs of you Customer(s), and. Delivery faster response time(s) for project commencement / on-demand renovation, repair, and minor new construction.

article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

orders and actions required by the Procurement Authority, are planned and discussed to. Procurement Authority with input from the FM team., The procurement authority and. The Contractor’s requirement for plans, sketches, shop drawings, as-builts, etc. Government provided plans, sketches, drawings etc.

Contract 100
article thumbnail

Best Practice Job Order Contracting

Job Order Contracting

County, State, and Local Governments, include secondary education unfortunately continue to use JOC simply as a means to speed delivery and bypass traditional procurement versus as a LEAN collaborative construction delivery method. Best Practice Job Order Contracting. 5117.9001 Definitions. As used in this subpart –.

Contract 100