Remove Budget Remove Budgeting Remove Legal Remove Life Cycle
article thumbnail

Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

Consistent delivery of quality repair, renovation, maintenance, and new build projects on time and on budget is possible using an integrated planning, procurement, and project delivery solution. Budget and Schedule. Journal of Legal Affairs and Dispute Resolution in Engineering and. Team Selection. Developing Contract.

article thumbnail

LEAN Construction Matters

Job Order Contracting

There is simply no excuse for only 20-25% of all construction projects to be on-time, built per owner requirements, on-budget, and without any legal disputes. First, life-cycle costs would drop dramatically. Consider for a moment that 80% of the cost of any building goes into ongoing operations, repair, renovations, etc.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

School Districts can Learn from LEAN Construction

Job Order Contracting

More specifically, Job Order Contracting, JOC, a LEAN construction delivery method, consistently delivers over 90% of renovation, repair, and construction projects on-time, on-budget, and to the satisfaction of all participants and stakeholders. Isn’t is time for your ISD to consider LEAN construction delivery? contact-form].

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

Nonetheless, it would be incorrect to assume that technology alone will solve the AECOO’s dismal legacy of low productivity, waste, and legal disputes. The key is to integrate people, process, technology, and current actionable data throughout the life-cycle of all projects. . The post appeared first on 4BT.

article thumbnail

4 Guidelines for Preventive Roof Maintenance

Flynn

Those are funds that could be allocated to the roof replacement budget, or elsewhere in the overall facility maintenance budget. Your accounting department can produce a report on costs associated with leak damage, lost use of space, legal claims, clean up, and operational interruptions.

article thumbnail

Why the BIM Revolution Fizzled

Job Order Contracting

The primary challenges facing the AECOO sector are due to lack of owner leadership and competency… The adoption of BIM as a tool to efficiently manage the life-cycle of built structures requires a full understanding of LEAN collaborative processes as they apply to asset total cost of ownership. The buck stops with owners.

BIM 100