Remove Budget Remove Design Remove Life Cycle Remove Modeling
article thumbnail

Job Order Contracting Life-cycle Facilities Value Management

Job Order Contracting

Job Order Contracting Life-cycle Facilities Value Management and improving AECOO outcomes for all participants and stakeholders. Job Order Contracting Life-cycle Facilities Value Management enables the efficient use of available funds targeted for executing renovation, repair, maintenance, and minor new construction projects.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges. INTRODUCTION.

article thumbnail

” Evidence-based ” Life-cycle Federal Facility Management, BIM, and the Status Quo – NIBS, FFC

Building Information Management

Key Topics / Take Aways: Identify and advance technologies, processes, and management practices that improve the performance of federal facilities over their entire life-cycle, from planning to disposal. Requirements for facility life-cycle management, efficient repair/maintenance/sustainability, BIM. Budget call process.

article thumbnail

BIM for FM

Job Order Contracting

Distribution and sharing of information by the Facilities Management Team is crucial to achieving cost efficient and high performing facilities, however, 3-D BIM visualization and modeling software is generally very sophisticated, relatively expensive, and very complex. 8. Cost of implementation is insignificant versus cost savings.

BIM 100
article thumbnail

Job Order Contracting Information

Job Order Contracting

Also referred to as the “Design-Bid-Build” process, this system has long been the most prevalent option for large and small public works contracts. Related Resources: ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management.

Contract 100
article thumbnail

Efficient Facilities Repair, Renovation, and Construction Basics

Job Order Contracting

Even though the majority of costs (approximately 80% of total life-cycle costs) occur during the operational and maintenance (O&M) phase, decision-making is largely made based upon lowest bidder versus best value as well as current year impacts versus multi-year considerations. Integrated Projects Delivery. Job Order Contracting.