Remove CAD Remove Compensation Remove Drawings Remove Modeling
article thumbnail

BIM IP

Building Information Management

For some reason BIM authors (architects, engineers, etc) think that because they create the initial BIM information they have the right to full control and to charge for the BIM model throughout the life of the building. The architect doesn’t model ductwork, they use the mechanical engineer’s model.

BIM 40
article thumbnail

20 construction industry trends to watch in 2020

Building Radar

Furthermore, forecast models calculate realistic time constraints for project control. BIM: Solving problems proactively and reducing costs Efficient digital planning, design, construction and management of buildings: Building Information Modeling (BIM) significantly reduces costs and risks in planning and construction processes.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

AutoCAD vs. ABS vs. Revit Systems

CAD Shack

Some of you may be too young to remember life before cable, but I bet most can remember a time when your choice of CAD technologies was limited to one. How many times have you heard draw it once? The minute you draw it twice in AutoCAD or ABS somebody changes one of two and now, there’s a disconnect. The President is on!

AutoCAD 40
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

building operating manual, controls as-built drawings, commissioning reports, re-commissioning reports) 7. Check all external restrictors for proper size and to verify the restrictor is installed per controls drawings. Obtain a current one-line drawing and verify meter is connected to the proper circuit. Special Instructions: 1.