Job Order Contracting 2021 and Beyond

Job Order Contracting

Job Order Contracting 2021 is a competitively bid, firm, fixed-price, indefinite quantity contract, and integrated planning, procurement, and project delivery program for as-needed construction services. If a UPB is properly created it consists of “bare costs” only (no contractor overhead or profit).

Contract 130
article thumbnail

LEAN Construction for Facilities Renovation, Repair, Minor New Construction

Job Order Contracting

Benefits of JOC: Reduced procurement costs and time. Few change orders. Value-based procurement. Reduced overhead for both owner and contractor. Using JOC as a method to bypass traditional procurement versus a best value delivery system. Shorter overall project delivery times. Faster response times.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

JOB ORDER CONTRACT (JOC) EXECUTION GUIDE. administration of the Job Order Contract (JOC), a Contract designed to provide the ORGANIZATION NAME with a flexible and responsive contractual capability in support of their renovation, repair, and minor new construction services needs. DEFINITIONS. the time of award.

Contract 100
article thumbnail

Worldwide Need for Construction Collaboration

Building Information Management

%/#/$ Change orders. Average procurement time. %/# and value of legal disputes. are: shorter procurement times, fewer change orders, virtual elimination of legal disputes, and more projects completed on-time and on-budget. Consolidation of procurement creates lower overhead cost and procurement cost.

article thumbnail

What is JOC – JOB ORDER CONTRACTING? A JOB ORDER CONTRACT?

Building Information Management

Job Order Contracting (JOC) is a firm fixed price, indefinite delivery, and indefinite quantity type contract used to execute sustainment, restoration, and modernization (SRM) projects at the installation. JOC is flexible and responsive and reduces engineering and procurement lead times. Reduction of change orders.

article thumbnail

Real-Time Work-in-Progress Figures — Construction’s Secret Weapon

ProcurementExpress.com

In the construction industry, WIPs cover the raw materials, plus labor and overhead, used as part of a project. But, procurement , project management, and the C-suite should all monitor WIP closely. Meaning, they’ve likely paid for most of the materials, labor, and overhead a while back. And what is yours?

article thumbnail

Sustainability of DOD Buildings – Reuse of Existing Buildings

Building Information Management

•Full modernization with a strict application of Historic Preservation Standards ( HPS) and other DoD facility design standards. Full rehabilitation/modernization but with strict application of Anti-terrorism/ Force Protection requirements through building hardening, seismic and other DoD facility design standards. LEED Silver.