Remove Change Orders Remove Document Remove Inspections Remove Schedule
article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

Sixty (60%) percent of all project fail to meet both cost and and schedule targets. Fortunately there are proven processes to better manage construction costs, schedules, and quality. The errors and poor processes result in change orders, project delays, and legal disputes.

Schedule 163
article thumbnail

JOC Procedures

Job Order Contracting

JOC PROCEDURES FOR ORDERING WORK . Initiation of a Job Order. Contract Administrator notifies the Contractor of a Project, schedules a Joint Scope Meeting, and issues a Notice of Joint Scope Meeting. Any required documentation and/or forms. Owner regularly inspects the site. JOC PROCEDURES FOR ORDERING WORK.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Texas Appellate Court Affirms Grant of Governmental Immunity From Suit Seeking Delay Costs

Constructlaw

Triple B’s work was scheduled to be completed within 300 days of commencement, but it encountered significant delays and finished over 250 days behind schedule. Triple B issued a change order for $515,000 in “cost impacts, delays, and disruptions,” stemming from its removal of utility lines not identified in the bid documents.

Texas 52
article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

They ensure everyone is on the same page from the get-go, on topics as diverse as how change orders how the chain of communication will be handled on site. They also try to identify special considerations and forestall potential areas of complication that can lead to change orders.

article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

Sometimes, the project won’t pass inspection, or it will need to be torn down due to safety and health concerns. 2: Thoroughly Document Mistakes. If possible, make sure to document the mistake visually with photos. 4: Create the Appropriate Repair Schedule. Finally, take a look at the overall construction schedule.

article thumbnail

The Complete Guide to Project Commissioning

Autodesk Construction Cloud

Much like shipbuilding, the process involves a series of documenting, scheduling, and testing processes. According to Whole Building Design Guide, “Buildings that are properly commissioned typically have fewer change orders , tend to be more energy-efficient, and have lower operation and maintenance cost.”

article thumbnail

An Introduction to Job Order Contracting

Job Order Contracting

Change orders easily increased project costs by 50% or more, and claims and litigation were the norm, versus the exception. JOC contractors strive for: • Fast Delivery • High Quality • No Change Orders • No Warranty Hassles • Maximize budgets. JOC’s history begins with the US Army in Europe in the 1980’s.

Contract 100