JOC Procedures

Job Order Contracting

Contractor prepares/updates Detailed Scope of Work referencing any sketches, drawings, photographs, and specifications required to document accurately the work to be accomplished and prepares a detailed line-item proposal of the planned work activity using the current unit price book (UPB). Any required documentation and/or forms.

article thumbnail

Common challenges in construction quality control and how to overcome them

Lets Build

Not to mention the cost pressures that can result from miscommunication regarding change orders. Inadequate documentation Poor document management is a massive detriment to a project’s quality, leading to defects, delays, rework, and overruns. Put someone in charge of this inspection plan and hold them accountable.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Common challenges in construction quality control and how to overcome them

Lets Build

Not to mention the cost pressures that can result from miscommunication regarding change orders. Inadequate documentation Poor document management is a massive detriment to a project’s quality, leading to defects, delays, rework, and overruns. Put someone in charge of this inspection plan and hold them accountable.

article thumbnail

3 ways to avoid defects in construction

Lets Build

Design defects are a result of the design team failing to produce organised and accurate construction documents. Defects due to omission are typically fixed through change orders that add to the scope of work for one or more contractors. Inefficient document distribution. Store your documents in one place.

article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

They ensure everyone is on the same page from the get-go, on topics as diverse as how change orders how the chain of communication will be handled on site. These are essential for preconstruction planning and for kicking off builds and keeping them strong throughout. Unfortunately, construction project success is not a given.

article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

The fundamental reason for poor outcomes is the failure to implement and properly manage robust and integrated LEAN planning, procurement, and project delivery processes. The errors and poor processes result in change orders, project delays, and legal disputes.

Schedule 163
article thumbnail

Data Analytics Trends in Construction

Viewpoint Construction Technology

Construction sites these days have no shortage of data: design and BIM data from the planning stages of a project, jobsite data collected by wearables, mobile devices and sensors on equipment/materials, accounting and job progress data from the office, project management data and much more. Diving Deeper into Construction Data.