Remove Commercial Remove Equipment Remove Feasibility Remove Schedule
article thumbnail

5 ways mass timber will reshape the design of life sciences facilities

BD+C

BR+A Consulting Engineers, and Code Red Consultants, there are feasible, cost-effective strategies for building mass timber labs that align with industry standards. Sullivan heads the firm’s architecture practice, encompassing the life sciences, academic, commercial, technology, and residential markets.

Design 113
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

This work should be scheduled at non-peak hours. Recommended Tools, Materials, and Equipment: 1. This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use. Recommended Tools, Materials, and Equipment: 1.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

The ordinary construction scheme is to embrace a foremost priority on cost control or schedule control. Development planning is crucial in managing & implementation of construction projects since it involves selecting the technology, recognizing feasible workflows & estimating specified resources. Scheduling.

Plans 52
article thumbnail

Considerations for marine engine replacement

CK Power

Analyzing cost, equipment and Tier 3 regulations will lead to a best-value marine engine replacement. Equipment options to consider. Will there be more equipment added to the boat that will put more strain on the generator? This reduces waiting periods for new equipment and streamlines the engine purchasing process.

article thumbnail

Job Order Contract Program Implementation

Job Order Contracting

The acquisition starts with the needs and feasibility study and is complete once the decision has been made to implement a JOC contract. Contractor Computer Equipment. The equipment specifications to support the pricing (UPB) software must be planned for and identified in advance. An acquisition timeline should be developed.

Contract 100
article thumbnail

Oregon Incentives and Workforce Development Guide

Buisness Facilities Contributed Content

Oregon Business Development Fund (OBDF): A revolving loan fund that provides term fixed-rate financing for land, buildings, equipment, machinery and permanent working capital. Business Oregon has selected a bond counsel firm with a pre-approved fee schedule. They provide long-term financing for land, buildings and equipment.

Oregon 40
article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

Industrial Revenue Bonds: May be used as long-term financing of up to 100% of a project for: Acquisition of land, buildings, site preparation and improvements; Construction of buildings; Acquisition and installation of furnishings, fixtures and equipment; Capitalizable soft costs (e.g., Pollution control equipment.

Income 108