Remove Consulting Remove Documentation Remove DOT Remove Visualization
article thumbnail

The Future of the New-Home Design Studio

Pro Builder

Who in your company is tasked with the content creation for the data loaded into digital tools, options-specific software, and hard-copy documents that communicate the design options available? With that, consider adding a part-time or full-time support person to increase Design Consultant efficiency. Maximizing Per-Home Revenue .

Design 98
article thumbnail

Revit OpEd: Egress Path Options

Revit OpEd

In 2006 I demonstrated (at Autodesk University) the then new line based family type by explaining how we could use it to document egress path requirements also known as exiting plans. Thats not a requirement but it does make it easier to visualize it in 3d views. Ive been a freelance Revit consultant since 2005. Other Links.

Revit 81
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Revit OpEd: View Discipline

Revit OpEd

Daryl wrote on Monday that the concept of View Discipline isnt documented well. Software documentation tends to be a bit dry, too often a very literal, "Un-checking this turns the feature off". Daryl used plan views as his example of how the help documentation isnt accurate. Ive been a freelance Revit consultant since 2005.

Revit 55
article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

From the readme documentation for what has been addressed with the service pack: Autodesk® Revit® Platform 2013 Enhancements. Improves stability and performance when using visualization features like Sky, Exposure, and Anti-Aliasing. Ive been a freelance Revit consultant since 2005. Autodesk Revit 2013 UR1. Images via.

Revit 61
article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect for corrosion. Consult the Material Safety Data Sheets (MSDS) for hazardous ingredients and proper personal protective equipment (PPE). Consult the MSDS for hazardous ingredients and proper PPE. Make a visual inspection of the flue and chimney, checking for obstructions. Check bolt torque. Lubricants.

article thumbnail

Best Practices for Multiple Award IDIQ – Task and Delivery Order Contracting

Building Information Management

This interim document contains our current views on best practices in the use of task and delivery order contracts, in particular multiple award contracts, as authorized by the Federal Acquisition Streamlining Act (FASA). Their input helped to form the basis for this interim document. This document includes five appendices.

article thumbnail

State by State Incentives Guide

Buisness Facilities Contributed Content

AZ Fast Grant: Up to $7,500 grant to pay for consulting services to advance Arizona-based technology companies. Human Resource consulting on Arizona’s labor laws. Available funding and the required match is dependent on the location of the project and the degree to which administrative and consultant expenses are minimized.

Income 108