article thumbnail

LEAN Asset Life-cycle Management – Achieve Optimal Construction Outcomes

Job Order Contracting

Optimal construction outcomes such as 90%+ of project on-time and on-budget and 96% satisfaction levels are achieved daily, however, by less than 5% of all real property owners, contractors, architects and engineers. Life-safety, environmental, economic mismanagement are the norm versus the exception. The net result is 2.5%

article thumbnail

Higher Education and Managing Repair and Renovations Efficiently

Job Order Contracting

While the problem is not new, what must change rapidly is the level of competence of higher education facility management professionals so that impending disaster is avoided. This includes facility management, finance, building users, AE firms, construction contractors, consultants, oversight groups, etc.

Education 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Big data, LEAN Construction Delivery, High Performance Buildings = Productive Life-cycle Facility Managment

Building Information Management

Our education and professional development systems are failing to properly address the fundamental concepts of life-cycle and total-cost-of-ownership management specific to the built environment.

article thumbnail

Big data, LEAN Construction Delivery, High Performance Buildings = Productive Life-cycle Facility Managment

Building Information Management

Our education and professional development systems are failing to properly address the fundamental concepts of life-cycle and total-cost-of-ownership management specific to the built environment.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Secondary data sources , such as contractor and subcontractor quotes are secondary data sources and should not be exclusively relied upon. #2 Credible Cost Estimate Core Elements #1 Objectivity – The information used and those invovled in the creation of the construction cost estimate must be objective.

article thumbnail

Suffolk Construction establishes Suffolk Sustainability Group

BD+C

Contractors Sustainability Sustainable Design and Construction Suffolk Construction, headquartered in Boston, has established the Suffolk Sustainability Group. His role encompasses the entire project life cycle.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges. INTRODUCTION.