Remove Defense Remove Design Remove Documentation Remove Engineering
article thumbnail

Construction Document Information Management

Job Order Contracting

Construction Document Information Management is central to productivity improvement. Construction Document Information Management. Imagine the ability to rapidly organize data and leverage mobile tools to enable access to, and the management of, actionable, standardized, defensible information… anytime and anywhere.

article thumbnail

Apply to be a Member of the ASHRAE Committee for Standard 189.1

Green Building Law Update

Standard for the Design of High Performance Green Buildings Except Low Rise Residential Buildings. Standards produced by ASHRAE are consensus documents developed and published to define minimum values of acceptable performance. provides a “total building sustainability package” to design, build and operate green buildings.

Defense 189
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Currency and Accuracy of Construction Cost Data used for IGEs

Job Order Contracting

As the AECOO sector has well documented history of rampant economic and environment waste due, further dependencies upon past outcomes clearly represents a problematic practice at best (AECOO – architecture, engineering, construction, owner, operator).

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al., Journal of Management in Engineering, 10(6), 26-29. Affairs and Dispute Resolution in Engineering and Construction, 3(1), 17-27. Army Corps of Engineers.

article thumbnail

What Is a Change Order?

Autodesk Construction Cloud

Change orders usually include information such as the description of the requested change, an itemized documentation of additional subcontractor costs, a summary of the cost of the proposed change, and a statement that states if the project completion date will change based on the change order. Ambiguous or inaccurate drawings.

article thumbnail

Dennis Calvert, the right architect for Design-Build

The Korte Company

Design-Build was not always accepted in the industry. So when he encountered Ralph Korte’s vision of Design-Build in action, he saw the industry’s future. . A move to Denver in 1971 landed him a role on a ten-man design team for the largest building to date in the city’s downtown, the Mountain Bell Denver Headquarters. “I

Design 52
article thumbnail

LEAN OpenJOC(TM) Job Order Contracting for Sustainable Facilities Repair, Renovation, and Minor New Construction

Job Order Contracting

Compliance reviews on all JOC proposals via an Informal Compliance Review ICR (TM) or Formal Compliance Review FCR (TM) at owner and/or cooperative designation. Supporting cloud technology – Program, Project, Estimate, & Document Management with export to PDF and spreadsheet formats. US Army Corps of Engineers.

Contract 100