Remove Defense Remove Documentation Remove Legal Remove Management
article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

The representative, ideally the Safety and Health Director or Manager or someone in upper management, should be well-versed in OSHA standards applicable to the business, health and safety conditions of the workplace under inspection, location of required records to be kept under OSHA (e.g. Keeping the inspection under control.

OSHA 156
article thumbnail

Job Order Contracting - Untitled Article

Job Order Contracting

The OpenJOC(TM) Job Order Contracting System embeds LEAN processes and can consistently deliver quality facilities repair, renovation, and minor new construction On-demand, On-Time, and On-Budget, with the lowest administrative costs available. The post appeared first on 4BT.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

5 Success Factors for Construction Firms

Construction Marketing

Visibility gives managers and executives a complete view into the daily processes and activities within their business. Manage Complexity. Managing multiple tasks and responsibilities is not easy. Benefits: Effectively manage active projects. Document Only What Matters. Work-sites too busy to document consistently.

article thumbnail

JOC Contract

Job Order Contracting

JOC Contract strategy, development, implementation, and management involves a thorough understanding of LEAN Construction and Life-cycle Asset Management. Facility management/engineering planning. Proper JOC contract design and management are central to improved renovation and repair outcomes. JOC Unit Price Book.

Contract 100
article thumbnail

RELi Could be Standard Practice in Nearly Every Real Estate Transaction

Green Building Law Update

Much more than only anticipating weather extremes, in the draft document expected to be approved in the coming days, RELi 2.0 Since 2017, RELi has been managed by the USGBC which, in conjunction with MTS and others led the evolution of RELi 2.0 The Green Business Certification Inc.’s s newest rating system, RELi 2.0

article thumbnail

RELi Could be Standard Practice in Nearly Every Real Estate Transaction

Green Building Law Update

In a conspicuous example, language in the Defense Authorization Act for Fiscal Year 2019 for the first time requires the Department of Defense, the largest owner of buildings in North America to respond to sea level rise and flooding by constructing new mission critical buildings 3 feet above the base flood 100 year elevation.

article thumbnail

Public Sector Real Property Management – Quality Construction Cost Estimating – Earned Value Management

Building Information Management

However, multiple studies/reports note that available and proven LEAN best management practices have not been implemented on a widespread basis. The basic characteristics of effective estimating are well-known and well documented. The associated processes for developing a cost estimate are equally well documented.