Remove Design Remove Drawings Remove Insurance Remove Overhead
article thumbnail

Some vital construction documents for a construction project

Construction Cost Estimating

In the design and construction part, various types of construction documents are utilized. This type of document also involve overhead costs, what to claim and your rights. Drawings: In this document, there are all set of drawings which are essential to execute the part of the job.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) Architect-engineer services as defined in FAR 36.102 and Design-Build requirements as defined in FAR 36.3 as-built drawings and warranties).

Contract 226
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Common Types of Construction Contracts And Their Use

cnstrctr

The different types of construction projects include: Lump Sum Construction Management (Cost Plus / Guaranteed Maximum Price) Design Build Design Build Finance Maintain. I would recommend a lump sum contract type if you’re looking to get moving quickly on a project and have a complete design. Construction Contract Types.

article thumbnail

Construction Forms for excel

Construction Cost Estimating

Construction Forms screenshot Construction Forms for Excel are designed to facilitate contracting and administrative tasks for construction work and projects. The package of over 140 purpose built forms are customizable Excel templates and documents addressing all areas of construction contract work.

Lien 45
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

administration of the Job Order Contract (JOC), a Contract designed to provide the ORGANIZATION NAME with a flexible and responsive contractual capability in support of their renovation, repair, and minor new construction services needs. coefficient (reference table of allowable overhead). JOB ORDER CONTRACT (JOC) EXECUTION GUIDE.

Contract 100
article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” ” I get this question a lot from my architect friends when helping them budget their projects through the design process. This is not unusual at the early to mid-phase of design.

article thumbnail

10 Contract Terms for Higher Profitability

PSMJ Resources

In addition to normal reimbursables, ask for reimbursement for items such as liability insurance premiums, computer time, and messenger services. With government clients, this term can reduce overhead, making your contract price more attractive. This eliminates the problem of one design firm holding funds for another.