article thumbnail

The Future of the New-Home Design Studio

Pro Builder

The Future of the New-Home Design Studio. It's time for design studios to evolve. What have we learned from the past 18 months of a global pandemic and its ripple effects on our society and industry, and what does the future look like for new-home design studios? Wed, 07/28/2021 - 14:16. Jane Meagher.

Design 98
article thumbnail

Door Closer Hinges: A New Approach

Construction Specifier

Innovative engineering has made closer hinges more compact and functional; the new generation of products provides unique combinations of features and benefits to address door closing challenges that are not satisfactorily met by overhead surface-mounted door closers. Performance. The closer hinges have built-in door stops. Aesthetics.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Is Estimate | Types of Estimate |Requirement Data for Estimation |Advantage of Estimate | Disadvantage of Estimate | Types of Cost Estimation

CivilJungle

The estimators should be experienced and thoroughly acquainted with the design techniques for reliable estimation. In the budget, allowance towards contingencies, 3 percent to 5 percent of the total expense, is designed to accommodate miscellaneous minor costs that are not part of any work item. Drawings (Plans, Sections, etc.).

article thumbnail

Can Support Services Be Recovered as Extra Administrative Costs?

Construction Dive

It is part of the contractor’s general and administrative overhead. recent example is a project in which flaws in the government design necessitated substantial revisions of the contract drawings. Sometimes, however, government demands can necessitate extraordinary efforts by a contractor.

article thumbnail

3 affordable housing projects that serve as social catalysts

BD+C

Trish Donnally MFPRO+ Blog Higher Education University Buildings Multifamily Housing Affordable Housing Senior Living Design Student Housing Designers Architects Projects Sustainable Development To say the United States is facing an affordable housing crisis is a major understatement.

Housing 111
article thumbnail

Some vital construction documents for a construction project

Construction Cost Estimating

In the design and construction part, various types of construction documents are utilized. This type of document also involve overhead costs, what to claim and your rights. Drawings: In this document, there are all set of drawings which are essential to execute the part of the job.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, 5117.9002 Applicability. (a) Architect-engineer services as defined in FAR 36.102 and Design-Build requirements as defined in FAR 36.3 as-built drawings and warranties).

Contract 226