article thumbnail

Should I Do A Full Wrap Of My Company Vans?

A David Creation

You can install a 1/4, 1/2, ¾, or full wrap (using printed vinyl), and it can be done on both purchased and leased vehicles in most cases. Just make sure you double-check with your dealership if you’re in a leasing situation to confirm the details of your contract. Invest in a Professional Design. Just make sure you do it right!

Leases 100
article thumbnail

Anatomy of a model apartment

BD+C

Anatomy of a model apartment 0 qpurcell Fri, 08/04/2023 - 09:47 Apartments Page’s interior designers curate model units that harmoniously cater to a range of users, allowing visitors to see a once-empty room as a place of respite and a home. Offering models with opposing characteristics allows an apartment building to reach a wider audience.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Illinois: Unveiling the Future of Digital Design and Manufacturing

Business Facilities

L ast year, Chicago celebrated the highly anticipated grand opening of the new UI Labs Digital Manufacturing and Design Innovation Institute (DMDII) on Goose Island. SOM’s design for the interior and architectural renovation emphasizes flexibility, fluidity, and information sharing. By the BF Staff. Evergreen Avenue.

article thumbnail

Rescue flights for Australians overseas during COVID-19 outbreak: Should the government come to the rescue?

Construction Test

” According to DFAT, “More than 300,000 Australians have returned home since 13 March, when the government advised all Australians to reconsider the need to travel overseas.” Just like the volcanic eruptions that grounded flights in Iceland and Bali, stranding thousands of travellers – or like the Boxing Day Tsunami of 2004.

Travel 26
article thumbnail

Path to Net Zero: A Guide to Carbon Offsets

Stok

While reducing embodied carbon , implementing energy efficient design, and transitioning to renewable energy are all sound approaches, some are more nuanced to tackle than others. When deciding how long the carbon offsets should last or account for, a common default is the number of years your building or lease will be in operation.

Green 79
article thumbnail

5 Current Construction Industry Challenges and How Technology Can Help

Fieldwire

Construction waste, fuel, emissions, and travel requirements have all led to a less than favorable view of construction when it comes to the green crowd. From machine scheduling to design improvement, machine learning is the future of construction. The Environmental Impact Needs to Be Addressed. Safety Incidents and Recordables.

article thumbnail

Ports And FTZs: Enter With Less Risk

Business Facilities

An airport of entry (AOE), usually designated with the word “international”, provides customs and immigration services for incoming flights. As the region’s conduit to travel, BNA often serves as the first and last impression of Nashville for travelers. million travelers, a nearly 10 percent increase over the previous year.

Risk 40