Remove Document Remove Documentation Remove Drawings Remove Schedule
article thumbnail

Redefining Construction Document Management

Viewpoint Construction Technology

Once building begins, plans, specs and drawings are tweaked as efficiencies are noted, errors are corrected or work gets completed throughout the process. Paper has been the traditional format for plans, specs and drawings in construction. Dealing with paper plans and drawings in the field can be a hassle.

article thumbnail

From Ten Hours to Five: Automating Manual Document Review Processes with JJ Rhatigan

Autodesk Construction Cloud

For one collaborator, a document or plan may be considered as an essential piece of information but for another team, it may be something they never use. Jamie Monaghan and Hui Qi Lim are Document Controllers at JJ Rhatigan and are responsible for managing and maintaining project documents. Standardisation for Improved Accuracy.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Some vital construction documents for a construction project

Construction Cost Estimating

If it is required to develop a new building or refurbish surviving property, the owner should have arranged a document so that the work & other portions of the construction project can be performed systematically. Each construction project should comprise of crucial documents that generally form the part of every construction contract.

article thumbnail

New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

While project schedules are helpful, they’re often static and don’t contain real-time info on a project. With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes.

article thumbnail

JOC Procedures

Job Order Contracting

Contract Administrator notifies the Contractor of a Project, schedules a Joint Scope Meeting, and issues a Notice of Joint Scope Meeting. Any required documentation and/or forms. Contractor issues a notification of substantial completion and submits appropriate documentation for project close-out. Initiation of a Job Order.

article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

But a pay app is actually a collection of supporting documents that first and second tier contractors submit to request payment. The construction contract will typically define the process for submitting a pay app, the documents to include, and the deadline for submission. Contractors get paid for the work they document.

Lien 98
article thumbnail

We Answer your Questions on Managing 2D Workflows and Drawings in Autodesk Construction Cloud 

Autodesk Construction Cloud

I recently ran a Live Webinar: Efficiently Manage 2D Project Workflows and Drawings in Autodesk Construction Cloud , and demonstrated how Autodesk Construction Cloud can help save time and efficiency even for those using 2D workflows and drawings. The schedule details, such as dependency, user fields etc.,