Remove Documentation Remove Drawings Remove Overhead Remove Reference
article thumbnail

A glossary of terms with reference to Construction Cost Estimating

Construction Cost Estimating

B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods, qualifications, assumptions, inclusions, and exclusions. Bill of quantities (BOQ) - a document used in tendering in the construction industry in which materials, parts, and labor (and their costs) are itemized. May also be called pricing.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

10 Essential Types of Construction Documents

Autodesk Construction Cloud

Construction documents help keep your projects organized and guide the construction process from start to finish. Having access to these construction documents puts information into the hands of the right people at the right time, so decisions can be made quickly and action can be taken to finish projects on time and within scope. .

article thumbnail

6 Tips for Getting Paid Now – Not Later

PSMJ Resources

Refer to article 9 of AIA Document B101-2007 for guidance. Also consider holding the retainer until you've received final payment, all final paperwork, guarantees, warranties, maintenance manuals, asbuilt drawings, and other traditional deliverables. Understand what your overhead factors are. Don't design for free.

article thumbnail

16 Things Every Contractor Should Know When Bidding a Job Order Contract

Job Order Contracting

For example, are drawings given to the general contractor 50% of the time? Information should include a description of current conditions including access, materials, dimensions, and a drawing/PDF, as well as a description and drawing/PDF of requirements. The Owner simply references their existing Technical Specifications.

Bidding 100
article thumbnail

Job Order Contracting Glossary

Building Information Management

It is sometimes use synonymously with the term “Coefficient”, and sometime refers to a cost localization factor that is used in addition to the “Coefficient”. The document may be referenced in the job order contract and may/or may not be directly provided by the creator of the unit price book and/or job order contract software.

article thumbnail

Rory Woolsey's Construction Estimating Blog: Mark It Up!

Rory Woolsey

“ What are the” appropriate” markups for overhead, profit and contingency when budgeting facilities construction projects?” Beyond this, the installing contractor’s overhead(s) and profit will need to be added. Overhead: Overhead is the markup for the general contractor’s home office overhead.