Remove Documentation Remove Engineering Remove Fabrication Remove Inspections
article thumbnail

5 Reasons to Move to Integrated Digital Delivery (IDD)

Autodesk Construction Cloud

It saw Integrated Digital Delivery (IDD) as an opportunity to facilitate seamless sharing and delivery of digital information—from design to off-site fabrication, and from on-site assembly to operations and building maintenance. 2 Better documentation reduces the risk of costly rework.

BIM 130
article thumbnail

Detail quality control methods in construction works

Construction Cost Estimating

This civil engineering article sheds light on the inspection method of various civil works as well as necessary documents to carry out an inspection at construction project. Construction activities and consequent inspection standard should be based on job site specifications, methods and drawings.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

MATERIALS FOR FORMWORK

The Constructor

Steel: Steel is also used in pre-fabricated formwork. Purpose made steel forms are fabricated when dimensional tolerances are critical, or when the forms are planned to be re-used. Aluminium: Often used in pre-fabricated formwork, that is put together on site. waffle floors).

Materials 136
article thumbnail

COMMON STRUCTURAL FAILURE CAUSES

The Constructor

Even experience in extensive design in academic context can provide only limited perspective in engineering decision making. Most lessons in engineering decision making come from the cases of histories of failures of structures, which itself are the results of a bad judgement, thus making us understand the pitfalls in conceptual design.

Concrete 177
article thumbnail

FORMWORK AND GOOD FORMWORK PROPERTIES

The Constructor

Its importance is evident when you consider that the cost of fabrication, erecting and striking the formwork, often exceeds the cost of the concrete it is designed to shape and support. Always inspect the formwork prior to pouring. RECOMMENDED FOR YOU Pre – Engineered Metal Buildings – Latest Trends Close

Concrete 223
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at. JOB ORDER CONTRACT (JOC) EXECUTION GUIDE.

Contract 100
article thumbnail

DEFLECTIONS IN DETERMINATE TRUSSES

The Constructor

The displacement can be computed as ……………. (1) In such cases, applying the principle of virtual work, ………………….2(a) 2(a) Where, = change in length of member k, = change in thermal expansion of member K = change in temperature. Tweet Loading GET LATEST TOPICS IN YOUR EMAIL- SUBSCRIBE NOW.

Concrete 128