Job Order Contract Unit Price Book Basics

Job Order Contracting

In addition, the ability to review and interpret construction drawings, work with cost estimating formulas and technologies, communicate information to disparate disciplines and audiences, and attention to detail are all additional requirements. Documenting and associated presentation of the estimate.

Contract 100
article thumbnail

16 Things Every Contractor Should Know When Bidding a Job Order Contract

Job Order Contracting

For example, are drawings given to the general contractor 50% of the time? Information should include a description of current conditions including access, materials, dimensions, and a drawing/PDF, as well as a description and drawing/PDF of requirements. Learn more… 1. Information varies by Owner. Here are a few. .

Bidding 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The Future of the New-Home Design Studio

Pro Builder

And, as builder profits increasingly depend on improving cost efficiencies and generating higher options revenue, the design studio environment needs to work better and deliver more results. It should drive higher-level option sales by presenting products in a way that heightens buyer desire and increases perceived value. .

Design 98
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

coefficient (reference table of allowable overhead). ORGANIZATION NAME Technical Staff / Facilities Management Department Representative(s) and authorized ORGANIZATION NAME Procurement Authority review the Contractor’s Proposal. The UPB costs should NOT include contractor overhead and profit. authorization. Small Tools.

Contract 100
article thumbnail

Detailed Line Item Unit Cost Construction Estimating, Public Sector, & Unit Price Books – UPB – UPG

Building Information Management

In addition, the ability to review and interpret construction drawings, work with cost estimating formulas and technologies, communicate information to disparate disciplines and audiences, and attention to detail are all additional requirements. Documenting and present the estimate.

article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). JOC Characteristics. (a)

Contract 100
article thumbnail

How to Select a JOC Unit Price Book

Building Information Management

Are demolition line items present ? The ability to review and interpret construction drawings, work with cost estimating formulas and technologies, and the ability to communicate information to disparate disciplines and audiences are also vital. Documenting and presenting the estimate. Identifying inclusions and exclusions.