n order to place grade and line for developing the sanitary sewer system, four methods are mostly applied. Methods of Setting Line and Grade in Construction of Sewer Sanitary System: 1. Stakes or crosses are set up on the surface on an offset from the centerline of sewer sanitary 2.

Sewer 40
article thumbnail

All You Need To Know About Construction Project Management To Get Started

Construction Marketing

Even infrastructure projects like roads and sewers. Heavy construction refers to megaprojects that are oftentimes infrastructure-focused, like dams or flood control systems and facilities. Tall skyscrapers, tourist attractions, factories, homes. Buildings come in many different types and scales.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

CE CALC – An exclusive online calculator for Civil and Structural Engineers

Construction Cost Estimating

CE Calc Civil Calculator refers to a useful construction tool for civil engineering calculation. Gravity Sewer: Sanitary and storm sewer, velocity, discharge, slope head loss and pipe structural loads. Open Channels: Flow velocity, discharge, slope, weirs, Parshall flume and Froude Number.

article thumbnail

What Is Pipe Fittings | Types of Pipe Fittings

CivilJungle

The side pipe of Wye is used to release the sewer gases in upward direction. Also, Read: Hand Level Surveying | What Is Site Level | How to Use a Hand Level | Estimating Distance with a Sight Level. The traps contain water which is used as the barrier which prevents entering the sewer gases. A Wye has two inlets and one outlet.

Union 52
article thumbnail

Characteristic of a site plan for construction

Construction Cost Estimating

Site plans are developed with line diagrams to a scale of 1cm = 5 m to 1 cm = 10 m which demonstrate the orientation of the building, boundaries of land, position of roads, drains, sewer lines, water pipelines, adjacent plots of lands with their ownership. Site layout plans should present a scale bar or a measured dimension.

Site 40
article thumbnail

All About of Plumbing Pipe Size Chart

CivilJungle

After that, we estimate the equivalent length of pipe and this is starting from the main street line. Piping Sizing Calculation – Capacity of a Sewer Pipe The capacity of an 8-inch sewer pipe with a decline of 0.5% Estimate demand using the table from the IPC that correlates wsfu to expected demand. Lav, Private 0.50

Sewer 98
article thumbnail

Dewatering system at job site

Construction Cost Estimating

Dewatering refers to a method that is applied to extract groundwater confined inside the soil of the construction site to make the foundation long-lasting. Under this method, the water is released through storm drains, municipal sewer system and irrigation purposes. The following methods are mostly used for dewatering :- 1.