Remove 2004 Remove Design Remove Schedule Remove Site
article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

For example, GAO and other studies/reports consistently report that errors and lack of due diligence with respect to original construction cost estimates are primary reasons for negative cost and schedule impacts, and overall poor project performance and outcomes. T The following figure, for example, was produced in 1972.

article thumbnail

SEO and PPC Best Practices Webcast

Construction Marketing

The free webcast for members and non-members is scheduled for Thursday, November 17, 2011 at 1 pm CST. The site links to the award-winning Construction Marketing Blog with marketing news, resources and related content, and the association’s Twitter , Facebook , YouTube and LinkedIn pages.

Illinois 238
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Characteristics of Strategic Collaboration and Efficient Construction Project Delivery

Job Order Contracting

2004; Black et al., Shorter construction schedules than planned. Partnering process model for public-sector fasttrack design-build projects in Korea. The benefits of strategic collaboration vs. traditional construction planning, procurement, and project delivery are well documented and partially listed below (Chan et al.,

article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

The building, designed by C.Y. Taipei 101 received the Emporis Skyscraper Award in 2004. They were the world’s tallest buildings from 1998 to 2004 if measured from the level of the main entrance to the structural top, the original height reference used by the US-based Council on Tall Buildings and Urban Habitat from 1969.

article thumbnail

6 showcase hotel construction projects

The Korte Company

It’s helped us learn a few important lessons we take with us on every hotel construction project: First, we’re responsible for designing and delivering lodging spaces that meet owners’ business goals. An owner’s best partner for hotel construction is a Design-Build firm who understands that. The design was put to the test on Aug.

article thumbnail

3D Printing in Construction: Growth, Benefits, and Challenges

Autodesk Construction Cloud

For more than a decade, 3D printing has been used in several ambitious initiatives and projects in construction, including: In 2004 , a USC professor attempted to 3D print a wall in what’s widely accepted as the technology’s first entry into construction. Design freedom. The Benefits of 3D Printing in Construction. Reduce human error.

article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.