Remove 2007 Remove Documentation Remove Schedule Remove Software
article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

article thumbnail

STAAD PRO MANUELS & GUIDES

The Constructor

Related posts: Design of Offshore Structures using STAAD.Pro and STAAD.Offshore STAAD.PRO 2007 Posted in Category: Software Manuels 1 Comment Sharath chandra Posted on 29/10/2010 at 21:42 can anybody please tell me where can i get the STAAD software????

Concrete 115
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Collaborative LEAN Construction Software

Job Order Contracting

The innovate and exclusive Collaborative LEAN Construction Software for the Enterprise or Single Organization offering all of these features. The innovate and exclusive Collaborative LEAN Construction Software for the Enterprise or Single Organization offering all of these features. 4BT LEAN CONSTRUCTION COLLABORATION SaaS Solution.

Software 136
article thumbnail

Revit OpEd: Due Diligence

Revit OpEd

The problems are with autodesk's management of the software and of the paying client base, who are always secondary to the shareholders. Meanwhile, autodesk provides dismal documentation. Content and Software Developers. Panel Schedule and Load Calculation Addition. These problems include: 1.It's 12:22 PM.

Revit 58
article thumbnail

Revit OpEd: Measure Between Two References

Revit OpEd

I can then produce a mass floor schedule to view the floor area. Yeah, in the context of the thread at Revitforum the comment was quick, and in a link.didn't care about retaining the information or documenting it. Content and Software Developers. ► 2007. (77). ► December 2007. (1). OpEd Videos.

Revit 65
article thumbnail

Revit OpEd: Revit 2013 Service Pack 1 Available

Revit OpEd

From the readme documentation for what has been addressed with the service pack: Autodesk® Revit® Platform 2013 Enhancements. Improves consistency of unit formatting within Panel Schedules. Content and Software Developers. Panel Schedule and Load Calculation Addition. ► 2007. (77). OpEd Videos.

Revit 61
article thumbnail

Civil Engineering Marvels- 5 Tallest Skyscrappers

The Constructor

Until 2007 it was the tallest building in the PRC, the fifth tallest in the world by roof height and the seventh tallest by pinnacle height. Its height was surpassed on September 14, 2007 by the Shanghai World Financial Center. It contains offices and the Shanghai Grand Hyatt hotel. Related posts: civil engineering?