Remove 2019 Remove Accounting Remove Drawings Remove Schedule
article thumbnail

Home Building by the Numbers

Pro Builder

The annual analysis, called the Comparative Financial and Operations Analysis (“Fin-Op” for short), draws from detailed information about various revenue, cost, and profit metrics provided anonymously by builders of varying sizes in different locations, serving as a benchmarking and forecasting tool for the company, builders, and the industry.

article thumbnail

(Still) Waiting for the Home Building Technology Revolution

Pro Builder

They thought scheduling was “pretty good.” . But despite access to an online scheduling portal from a big-name software company, most of the actual scheduling and updates were done by the field superintendent by phone. The very best ran schedules of 60 to 65 days, with some even in the low 40s. Technology wasn’t a factor.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

This practice does not work for material, labor, equipment, nor does it account for local market productivity in any effective manner. Locally researched JOC Price Books are readily available to provide cost visibility, cost transparency, and therefore improve cost management. as-built drawings and warranties). d) Distribution.

Contract 226
article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

Alexis Udine , 37, Account Supervisor, Group Two Advertising, Philadelphia. Extracurricular • 2020 president of the Home Building Association of Richmond, previously the Legislative Committee chairman • Regional VP, Home Builders Association (HBA) of Virginia, 2019-2020. Secret Life • CrossFit aficionado. . . . . PDS Studio.

article thumbnail

Why Projects Fail

Job Order Contracting

The key to consistent delivery of successful projects therefore lies in the ability to account for and/or manage variations as they occur. The ability to successfully account for and manage change during a project lies in an organization’s leadership and level of maturity relative to its strategies, processes, goals, and resources.

article thumbnail

Savannah Notches Record Cargo Volume

Buisness Facilities Contributed Content

Southeast, Savannah’s logistical advantages drawing new customers to Georgia, and cargo diverted from the West Coast,” Foltz said. Container tonnage accounted for most of that growth, adding 991,031 tons (up four percent), for a total of 25.81 “The expansion was fueled in part by heightened demand in the U.S. million tons, or 3.6

Georgia 40
article thumbnail

Sounding Off — Construction Professionals Talk Emerging Technologies

Viewpoint Construction Technology

Here are three of those clients’ answers: With technology booming in the construction industry, what are some of the newer technologies that have you most excited moving forward into 2019? The newer technologies for 2019 have us looking forward to being able to compete at the level of a larger company without breaking the budget.