Remove 2019 Remove Documentation Remove Drawings Remove Schedule
article thumbnail

Autodesk Acquires AI Company, Pype, and Makes Investments into Two Others

Construction Junkie

In 2019, the company combined all of those acquisitions and their native BIM 360 application in Autodesk Construction Cloud (ACC). via Autodesk. In 2018, Autodesk made a huge splash in the construction industry by acquiring PlanGrid , BuildingConnected , and Assemble.

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

However, informal (shop) and as-built drawings, incidental to the job, reflecting the plan of action and the completed project, are anticipated under a JOC. as-built drawings and warranties). as-built drawings and warranties). shall not be acquired under a JOC. 5117.9003 Use of job order contracts.

Contract 226
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Increasing transparency for Copenhagen Metro with Autodesk’s Construction Cloud

Autodesk Construction Cloud

In 2019, the M3 Cityringen opened. We are unable to collaborate on shared documents with internal and external project team members which means we spend a lot of time working in 2D,” says Joe. The team uses 2D drawings which are printed and manually marked up with changes or issues as well as spreadsheets to manage certain workflows.

Metro 98
article thumbnail

Learn What’s New in Revit 2019 for Structural Engineers and Detailers

BIM & Beam

Building on Autodesk’s strategy to make Revit a robust model authoring tool for designing and detailing, the Revit 2019 release includes a number of new features that increase modeling versatility, accuracy, and productivity for engineers and detailers. Documentation with steel details. Detailed Steel Design.

article thumbnail

Eamon Costello Future-Proofs Its 45-Year-Old Business with Autodesk Build

Autodesk Construction Cloud

Processes at Eamon Costello were largely paper-based, with staff taking large amounts of time to compare drawings manually and fill in onerous forms. In 2019, the company leadership team had a “Eureka moment” and decided to re-evaluate the processes in place across the whole business. “We Inconsistency was a major challenge.

article thumbnail

Why Projects Fail

Job Order Contracting

Organizations that do not implement and continuously import upon a program-based approach, under which all projects a planned, procured, and executed, suffer from unclear objectives , shifting requirements , unrealistic schedule s, and reactive planning , Poor planning and poor change management impede individual project successes.

article thumbnail

Leading the Home Building Industry: Pro Builder's 2021 Forty Under 40

Pro Builder

The project proposes sustainable solutions for Detroit’s 48204 ZIP code • Led the initiative to transition from CAD to BIM construction documentation and introduced several technical innovations to streamline operations • Created a custom BIM content library with hundreds of host components and subcomponents. Koby Bowen, 38. Philip Chan, 37.