Remove Agreement Remove BIM Remove Drawings Remove Modeling
article thumbnail

#117:  Building Information Modeling

NH Construction Law

Over the past decade, Building Information Modeling (“BIM”) – computerized 3D portrayal of integrated building elements that allows a project or project subset to be built virtually before being built in the field – has become prolific in commercial construction. This is not your father’s CAD system.

article thumbnail

Behind the Build: Interview with Mark Decker, Sr. Manager of BIM at CDM Smith

Autodesk Construction Cloud

BIM Managers carry the burden of having to make clear, quick, and concise decisions. For Mark Decker , Senior Manager of Building Information Modeling (BIM) at CDM Smith , it’s choosing and leveraging the right technology to enable him, his firm, and his clients to reach or exceed expected outcomes. Manager of BIM.

BIM 59
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM IP

Building Information Management

When discussing BIM with those yet to take it up the topic of Intellectual Property invariably comes up. It is so important to them it comes across as a major reason they are not using BIM (although I suspect it is more of an excuse). IP and BIM PROCESS. In the BIM context if everyone shares everyone benefits.

BIM 40
article thumbnail

Everything you need for building and project management

Job Order Contracting

Building Information Modeling. Building in Cloud utilizes the benefits of BIM (Building Information Modelling), to increase levels of efficiency and collaboration between team members involved in the design, construction and operational phases of the building life-cycle. Asset Information Model.

article thumbnail

What Is a Change Order?

Autodesk Construction Cloud

As Construction Law Today explains, “a Change Order is a bilateral agreement between parties to the contract–an owner and prime contractor, prime contractor and subcontractor, two or more subcontractors–to change the contract. A change order represents a mutual agreement to change the work, schedule, price, or other term of the contract.

article thumbnail

SHOP DRAWING creates maximum benefits for construction companies

Construction Cost Estimating

The shop drawing is a drawing or collection of set of drawings, diagrams, illustrations, schedules, and other data or information specifically generated or assembled by the contractor, supplier, manufacturer, subcontractor, or fabricator to demonstrate some portion of the work for the approval of architect or engineer.

article thumbnail

Critical Issues and BIM – NIBS buildingSMART alliance conference – January 7-11, 2013

Building Information Management

Efficient construction delivery methods (IPD – integrated project delivery, JOC – job order contracting), cloud computing, and BIM are all integral components. Symposium Title: Integrating BIM: Moving the Industry Forward. Friday: BIM Academic Education Symposium. Day(s)/Date(s): January 7-11, 2013.

BIM 45