Estimating Facility Life-cycle Costs

Job Order Contracting

Estimating Facility Life-cycle Costs is a critical aspect of facilities management. Key elements associated with Estimating Facility Life-cycle Costs include the following: Experience. Systems costs and systems life-cycles. Used of standardized data architectures (CSI Uniformat, CSI Masterformat).

article thumbnail

Digital Twin – Aligning the physical and functional status of buildings and other physical objects with a corresponding digital model makes it possible to monitor and optimally manage capital reinvestment throughout their life-cycle.

Job Order Contracting

Aligning the physical and functional status of buildings and other physical objects with a corresponding digital model makes it possible to monitor and optimally manage capital reinvestment throughout their life-cycle. Requisite Components of a Physical Asset Life-cycle Management Solution.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN Construction Project Delivery and Facilities Operations, Maintenance, and Life-cycle Management

Job Order Contracting

Continuous improvement the O&M Plan and associated processes. LEAN Practices Asset Competency Model. Strategic planning. Space planning. Capital planning and management. Life-cycle Management. O&M Plan. Standardized data architectures (Cobie, Masterformat, Uniformat, Omniclass).

article thumbnail

12 Step Program for Creating Credible Construction Estimates

Job Order Contracting

The below 12 Step Program for Creating a Credible Construction Estimate is a valuable tool for any real propery owner or services provider. #1 1 Define estimate’s purpose ■ Who will use the estimate and how. Required level of detail, and overall scope. #2 Monte Carlo simulation) to develop a confidence interval around the point estimate. ■

article thumbnail

Suffolk Construction establishes Suffolk Sustainability Group

BD+C

His role encompasses the entire project life cycle. In design, Swenso collaborates closely with design teams to optimize strategies for cost effectiveness to meet operational carbon goals using life cycle costing. Mchael Swenson, Director of Sustainability at Suffolk Design.

article thumbnail

Construction Classification Criticality – A Draft White Paper

Job Order Contracting

Architecture, Engineering, Construction, Facilities Management, & Life-cycle Management of the Built Environment. The combination of information related to all aspects of physical assets life-cycle is best called a physical asset model. Construction Classification Criticality.

Drafting 100
article thumbnail

Construction is NOT complex…. People are. Successful Construction Project Delivery Requirements

Job Order Contracting

Who plans and prioritizes project considerations? The above represents the initial “concept” or “planning” stage, however, the steps must be repeated throughout the planning, procurement, and project delivery phases. A robust processes assures answers to the following questions are known.