Remove Books Remove Documentation Remove Estimating Remove Overhead
article thumbnail

Beware of Using Assemblies for Job Order Contracting

Job Order Contracting

Some suppliers of Job Order Contracting software and cost data use “Assemblies” within what is supposed to be a unit price book (UPB). Each aspect, such as materials, labor, equipment, and overhead, should be itemized separately. The latter includes studs, wiring, wallboard, etc. Market conditions can fluctuate frequently.

Contract 193
article thumbnail

Optimizing Construction Cost Estimating Outcomes

Job Order Contracting

Optimizing Construction Cost Estimating Outcomes requires experience, LEAN management practices, common data outcomes, metrics, and continuous improvement. Request our white paper to learn more about Optimizing Construction Cost Estimating Outcomes. Below is a the Table of Contents for the 20-page document. contact-form].

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contract Unit Price Book Basics

Job Order Contracting

Job Order Contract Unit Price Book Basics. Detailed Line Item Unit Cost Construction Estimating, & Unit Price Books, UPB (Unit Price Guides-UPG). Materials, labor, and equipment cost breakdowns and detailed descriptions in plain English provide the highest level of granularity and value when preparing a cost estimate.

Contract 100
article thumbnail

Electrical Estimating Methods (RSMeans) - an exclusive estimating book for electrical estimators & contractors

Construction Cost Estimating

Electrical Estimating Methods (RSMeans) - an exclusive estimating book for electrical estimators & contractors Wayne J. Del Pico has written an exclusive book alias Electrical Estimating Methods (RSMeans) 4th edition. construction estimating construction materials electrical system estimates'

article thumbnail

Army Job Order Contracts FAIL to meet AFARS requirements MOST OF THE TIME

Job Order Contracting

The J OCPB (JOC Price Book: reflects the current local costs in detail for construction tasks expected to be performed in the geographical area of the base contract with the primary use of developing a detailed line-item price. This is a national average cost book that DOES NOT REFLECT LOCAL COSTS. 5117.9001 Definitions.

Contract 226
article thumbnail

The Simple Guide to Repair, Renovation, Construction Cost Control

Job Order Contracting

Project Cost Management Processes The policies, procedures, data sets, tools, and documentation used for planning, executing, and controlling project cost are included with a LEAN OpenJOC enterprise system. All changes must be formally approved and documented per the defined program operations manual and/or execution guide.

article thumbnail

Detailed Line Item Unit Cost Construction Estimating, Public Sector, & Unit Price Books – UPB – UPG

Building Information Management

” Definition: detailed cost estimate: “a forecast of construction cost prepared on the basis of a detailed analysis of materials and labor for all items of work.” – 13th edition of the Architect’s Handbook of Professional Practice. Line item estimates are also used to create and validate construction budgets.