Integrated Construction Planning, Procurement, and Project Delivery Solution

Job Order Contracting

Consistent delivery of quality repair, renovation, maintenance, and new build projects on time and on budget is possible using an integrated planning, procurement, and project delivery solution. Budget and Schedule. Shared profit and risk and jointly developed project goals and values are keystones for team alignment for any project.

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

Sharing actionable, transparent information with all construction project participants and stakeholders early on, and throughout the construction and operations life-cycle of a built structure, would measurably mitigate change orders, legal disputes, and waste. and maintenance information into the building knowledge base.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Best Value Facilities Repair, Renovation Work Order Delivery

Job Order Contracting

An integrated planning, procurement, and project delivery solution that drives consistent on-time, on-budget, quality outcomes at a fair price. Collaborative design for constructibility. All parties can visualize project and work order requirements at a granular level and drive efficient life-cycle management.

article thumbnail

BIM, Value Management, Life-cycle Cost Management

Building Information Management

BIM is the life-cycle management of the built environment supported by digital technology. Unfortunately, too much emphasis has been placed upon 3-D visualization and other technology components vs. the process of life-cycle management. Consequently, the need for value management emerges. INTRODUCTION.

article thumbnail

” Evidence-based ” Life-cycle Federal Facility Management, BIM, and the Status Quo – NIBS, FFC

Building Information Management

Key Topics / Take Aways: Identify and advance technologies, processes, and management practices that improve the performance of federal facilities over their entire life-cycle, from planning to disposal. Requirements for facility life-cycle management, efficient repair/maintenance/sustainability, BIM. Budget call process.

article thumbnail

The Road to Construction – On-Time & On-Budget

Building Information Management

of global construction projects are completed on-time and on-budget. As long as Owners continue to primarily use design-bid-build, low-bid, or even design-build, versus truly LEAN construction delivery methods, economic and environmental waste associating with buildings and infrastructure will continue to run rampant.

article thumbnail

Construction Project Management

Job Order Contracting

Properly designed and implemented Collaborative LEAN Construction Project Management consistently delivers 90%+ of projects on-time, on-budget, and to everyone’s satisfaction. Building in Cloud is designed precisely to meet these needs: to share and manage building and project information and drive greater team performance. .