article thumbnail

Plan markups made easier, improved Forms tab and Change Orders: Fieldwire’s Q4 product updates

Fieldwire

Change Orders Now available as part of Fieldwire’s Project Management suite, create Change Orders to automatically calculate costs, monitor project status and track progress through approval. Learn more about Change Orders on our blog. Previously, only 5 photos were able to be uploaded at a time on mobile.

article thumbnail

Payment Applications 101: A Guide to Pay Apps in Construction

Fieldwire

But a pay app is actually a collection of supporting documents that first and second tier contractors submit to request payment. The construction contract will typically define the process for submitting a pay app, the documents to include, and the deadline for submission. Contractors get paid for the work they document.

Lien 98
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What Happens When Change Order Procedures are Ignored?

Construction Dive

By Bruce Jervis Construction contracts frequently contain detailed procedures for processing change orders. The tendency is to defer documentation. The change order procedure, which appeared so orderly and logical on paper, falls by the wayside. The problem is that the parties seem to seldom follow the procedures.

article thumbnail

Green Buildings are Subsidizing Conventional Buildings Stymying Climate Progress

Green Building Law Update

The financial value of green buildings is well documented, from commanding higher rents, greater occupancy rates, and increased occupant satisfaction, to lower operating costs for everything from reduced insurance premiums and less energy utilized, easily resulting in an increased return on investment of more than 9% over conventional building.

Green 293
article thumbnail

Adaptive Construction Planning, Procurement, and Project Delivery

Job Order Contracting

Program Management Contract Management Project Management Work Order Management Full Document Management (version control, inclusive of document “check-in/check-out”) Building Management Geolocation Space Management Component Management Issues/Task Management Team Management Contractor/Subcontractor Management MBE/WBE/HUBZONE… Management BIM Viewing (..)

article thumbnail

Credible Construction Estimate Core Elements

Job Order Contracting

GAO, 2009 The associated processes for developing a credible construction cost estimate are equally well documented. “Despite the fact that these basic characteristics have been published and known for decades, we find that many agencies still lack the ability to develop cost estimates that can satisfy them”. –

article thumbnail

The importance of keeping construction daily logs for every site activity

Lets Build

Skipping these logs increases your risk of a small issue becoming a massive one because no one documented it. Protect yourself from disputes In the face of a dispute, you need a foolproof trail of documents to protect yourself and your company. If you’re like most site managers, you probably chose the latter.

Site 148