Remove Claims Remove Design Remove Negotiation Remove Products
article thumbnail

I Lived It: Litigator Provides His Perspective on Solar Warranty Claims

Constructlaw

This article explores practical steps a solar array owner or operator can take now to better position itself to make warranty-related claims five, 10 or even 25 years into the future. Reposted from Solar Power World with permission. The latter approach was the playbook used by both manufacturers in the disputes referenced.

Claims 52
article thumbnail

Fraud as an Exception to the Economic Loss Doctrine: Changing Trends in Colorado and Tennessee

Constructlaw

Most frequently, the Economic Loss Doctrine bars negligence claims. Its outer bounds begin with intentional torts, and most jurisdictions do not apply the Economic Loss Doctrine to fraud claims. Weyerhaeuser, a designer and manufacturer of lumber products, sold wooden support joists to Dream Finders Homes.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Report reveals industry unprepared for growing pressures

Construction Law

Some 86% of respondents described themselves as ‘consultants’, held to include the design team, surveyors and specialist consultants. Claims for extensions of time was the most common cause of disputes, reported by 50% of respondents. What do the results of the survey tell us then?

article thumbnail

Why a Single-Vendor Technology Strategy Will Work Best for Your Construction Company

Viewpoint Construction Technology

Within the construction industry, we’ve seen first-hand the approach leading organisations have embarked upon; acknowledging the importance of implementing software technologies as a replacement to manual procedures with the purpose of improving competitiveness through improved business processes, employee productivity and efficiency.

Software 130
article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

Completed Individual Job Orders (IJO), Task Order (TO), or Job Orders (JO) are submitted to the a designated office/person in accordance with regulations and standard procedures. interior design services. Negotiation of Task Order. If necessary, the Owner and Contractor must also negotiate the NPP tasks to. methods.

Contract 100
article thumbnail

OSHA Alert: How to Prepare for an OSHA Inspection

FDR Safety

This can be accomplished by asking the OSHA inspector to wait for the arrival of the designated representative before starting the inspection. Where the inspector refuses to wait or where it is impossible for the representative to personally appear, designate a back-up to fill in. If you’re unsure seek advice from counsel.

OSHA 156
article thumbnail

Every Owner Should Implement JOC – JOB ORDER CONTRACTING – for Renovation, Repair, Sustainabilty, and Maintenance Construction Projects

Building Information Management

What’s Wrong with Design Bid Build? Traditional design-bid-build,DBB, is costly, antagonistic, and simply inefficient. DBB is exclusively responsible for the construction sectors poor productivity versus all other business sectors. Items that are not in the UPB can be negotiated, priced, and added to the UPB at any time.