article thumbnail

Creating a JOC Coefficient?

Job Order Contracting

Materials. General / Prime Contractor Overhead. Workmen’s compensations insurance. Shipping of all materials to the jobsite. Items included in a JOC coefficient (also known as a “Bid Factor”). Labor (Both during Normal Work Hours and Outside of Normal Work Hours). Equipment. Subcontractor costs.

Insurance 233
article thumbnail

2020 Guide to Construction Cost Estimating

Job Order Contracting

Material costs are either. Based upon contract requirements, local labor costs may be sourced from published Davis Bacon Wage Rates, or published or researched local prevailing wage rates with appropriate inclusion markups for worker compensation, unemployment, liability insurance and allowance for small tools and consumables.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Job Order Contracting Training Note – JOC Coefficient

Job Order Contracting

home office overhead; insurance, bonds, and indemnification; project meetings, training, management and supervision; mobilization and close-out for the contract and each Project/Job Order; project office staff and equipment; profit; subcontractor’s overhead and profit; all taxes for which a waiver is not available including material sales tax (..)

Contract 100
article thumbnail

6 Dangers Of Falling Debris In Construction Sites

Construction Marketing

Whoever is responsible for breaching their duty of care should compensate for the injuries. Construction workers can be injured by any material, especially if they fall from a great height. Any falling object, material, or tool can be fatal, especially on construction sites. The Dangerous Nature Of Falling Debris.

Site 156
article thumbnail

Job Order Contracting Guide

Job Order Contracting

GENERAL – Cost data is organized using MasterFormat2004+ [1] and includes detailed line item description and associated material, equipment and labor as appropriate. BEST VALUE – As noted, all unit price line item provided incorporate locally research labor, material, and equipment costs.

Contract 100
article thumbnail

Construction Estimating

Chianelli Estimating

Recently Contractors and Owners have found that Outsource Estimating is becoming a practical way to cut overhead. They do not have the burden of carrying costs like workmen’s compensation, general liability insurance, unemployment related costs, vacations or sick days, etc.

article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

project task/line item, a full description in plain English, a unit of measure and a corresponding unit price, including labor, material, and equipment details, and an associated approved contractor coefficient are to be the basis for Contractor compensation. coefficient (reference table of allowable overhead). authorization.

Contract 100