Remove Concrete Remove Documentation Remove Modeling Remove Project Management
article thumbnail

Rebar in Revit: Power up your productivity with BIM Designers

BIM & Beam

Advance BIM Designers is a BIM solution for improving structural project management. It helps users to create, design, document, track and control structural members of a BIM project while also working in multiple BIM environments.

BIM 90
article thumbnail

What’s the difference between RFIs, Submittals and Specifications?

Fieldwire

The construction RFI is a formal written process in which parties, such as the contractor and designer, clarify information gaps in construction documents. RFIs, on the other hand, are used to clarify, ask and determine the design intent of the project. Assume that a construction project involves building a new hospital.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Enabling real-time collaboration in Egyptian construction

Autodesk Construction Cloud

Not only that, but the fact that there are no conflicts between different versions being worked on by different teams also saves huge amounts of time, stress and rework, says Ahmed Nafea, Building Information Modelling (BIM) manager in Polar Management, the project management arm of Redcon.

article thumbnail

STEPS IN ANALYSING A BRIDGE

The Constructor

The word idealized is used because the bridge engineer needs to be aware that he is only analyzing an idealized model of the bridge and not the bridge itself. The word idealized is used because the bridge engineer needs to be aware that he is only analyzing an idealized model of the bridge and not the bridge itself.

Concrete 180
article thumbnail

How Much is Poor Construction Document Management Costing You? 

Autodesk Construction Cloud

As teams get larger and construction projects become more complex, proper document management needs to be an integral part of your workflow. Poor document management is detrimental to a project and can lead to delays, budget overruns , and rework. trillion in 2020.

article thumbnail

Civil Engineering Software | List of Civil Engineering Software | List of Engineering Software

CivilJungle

This software can help in drafting & documenting, designing, visualizing & analyzing & so on. List of Civil Engineering Software: This software are substantially beneficial in Construction projects. Microsoft Project (MS Project). Software Required for 3d Modeling of Structure/Architecture.

article thumbnail

Five Causes of Construction Rework and How to Avoid Them

Fieldwire

Inadequate quality management – Quality control (QC), quality assurance (QA) and monitoring are not sufficiently conducted to identify issues before rework is required. Misinterpretation of plans and specifications – work is not installed in accordance with construction documents, or documents may be not clear or current.