Remove Concrete Remove Drawings Remove Office Remove Visualization
article thumbnail

New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes. Multiple assets can also be made quickly when drawing on a sheet.

article thumbnail

New Asset Features to Boost Progress Tracking on 2D Drawings

Autodesk Construction Cloud

With these new capabilities, you can visually markup 2D sheets and track asset progress to keep office teams updated while empowering folks in the field to forecast their productivity and quickly adjust to scheduling changes. Multiple assets can also be made quickly when drawing on a sheet.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Classes for Field Teams at AU 2023

Autodesk Construction Cloud

Beyond that, field teams must collaborate closely with folks in the office to ensure the seamless flow of information. By staying in sync with office teams, those in the field can minimize errors and ensure projects stay on track. Come and see Baker Concrete Construction, Inc. CS601614 | Where's the Issue?

Autodesk 102
article thumbnail

10 Principles of Architecture | What Is Architecture | Why Need Design Principles in Architecture

CivilJungle

The contrast of texture is a method that draws attention to a particular point or place of a design by the texture. There is a term called visual weight. Visual weight is the property that gives elements in a design an ability to draw attention. Visual balance works just the same as physical balance.

article thumbnail

How to Do a Takeoff in Construction: A Step-by-Step Guide   

Autodesk Construction Cloud

They also draw from their experiences from previous successfully completed projects to identify savings. For example, when entering the required amount of concrete for the project, the estimator may input the following information in the construction takeoff: . Description: 6″ concrete slab on third floor . QTY: 1000

article thumbnail

Design-Build gets sweeter: Expanding a Hershey plant with a high-tech approach

The Korte Company

Now, designers can use software like Revit and Navisworks to visualize wall thickness, layout, facility equipment and details like piping and ductwork. And he listened, understanding that these systems were designed to be hung from 12” thick concrete — a first for both him and our managing principal, Darlene Rutkowski-Hanks.

Design 52
article thumbnail

A Giant That Is (Still) Creeping Through the Construction Industry: Digitization

Building Radar

This may be because working with soil, stone, steel and concrete is so analog. In any case, this is certain: Digitization on the building site and in the offices for planning and administration must and will progress faster. Back then, a robot arm applied layers of concrete instead of plastic.