article thumbnail

The Complexity Of OSHA’s PSM Standard

FDR Safety

For those of you who deal with PSM, you know this is a critical first step in determining if a traditional risk-based approach will suffice from a compliance perspective. When deciding that risk mitigation is needed, the concept of feasibility comes into play to demonstrate due diligence in complying with the OSH Act.

Risk 223
article thumbnail

Constructing with Intelligence: How Autodesk AI Helps You Be More Efficient

Autodesk Construction Cloud

The good news is that you can now access better, faster, and more intelligent tools with Autodesk that can help mitigate project and business risks and further advance your team’s productivity. And as of this year along the tool has been used over 5 million times, helping Autodesk users automatically identify and minimize project risk.

Autodesk 142
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

? Updated ANSI standards a significant tool for U.S. industry

FDR Safety

American National Standard provides guidance for suppliers and users to achieve acceptable risk. There is no such thing as being absolutely safe, that is, a complete absence of risk. All machinery contains hazards, and some level of residual risk. Risk assessment provides the foundation to select feasible safeguarding.

article thumbnail

Level Up Design and Coordination Workflows with Accessible Reality Capture 

Autodesk Construction Cloud

For starters, you’re dealing with an old structure without CAD files and limited documentation. feel that time constraints and urgency present the greatest risk to decision-making. . Being able to track progress on-site provides a visual account of what was done in each phase of the project using laser scan snapshots.

Design 119
article thumbnail

Classes for Field Teams at AU 2023

Autodesk Construction Cloud

Field teams and managers constantly deal with multiple moving parts. After the data is collected from site, we can display this information in a graphical dashboard from Power BI and incorporate interactive 3D visuals and/or 2D plan views to interact with the data. REGISTER NOW Why should field teams attend AU 2023?

Autodesk 102
article thumbnail

How To Choose The Right Crane For Your Project

Construction Marketing

Although cranes have made it easier for construction workers to deal with heavy loads, they can still encounter problems that can pose a serious risk to people and property, like incorrect assembly or poorly secured loads. Ensure that your crane has passed the safety standards.

Budgeting 156
article thumbnail

Damage Control: 5 Ways to Manage Construction Mistakes

Autodesk Construction Cloud

When it comes to large construction projects, the last thing a contractor wants to deal with is a costly mistake that will cause them to absorb the repair costs into their budgets. If possible, make sure to document the mistake visually with photos. 5: Perform Project Risk Assessment.