Remove Design Remove Documentation Remove Procurement Remove Subcontracting
article thumbnail

Controlling Construction Costs, Rocket Science, and Time Travel

Job Order Contracting

Integrated Project Delivery (IPD) for major new construction and LEAN Job Order Contractin g for repair, renovation, maintenance, and less design intensive new construction are proven programmatic processes that can save 30%-40%+ versus design-bid-build (DBB), CM@R, design-bulder (DB) and other more traditional forms.

Travel 177
article thumbnail

IDIQ Construction Contract Guide

Job Order Contracting

Initial basic intent was to speed procurement via the pre-selection of a pool of pre-qualified contractors, however, in may cases has evolved into an elimination of checks and bases associated with traditional procurement methods. No ability to subcontract—limited to trade specified in the contract. T and M Basics. •

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Detailed Job Order Contract Operations Manual

Job Order Contracting

The appropriate selection of independent, objective, and experienced JOC consultant to assist in program design, implementation, and management can provide significant value to JOC owners and contractors. JOB ORDER CONTRACT ACQUISITION/PROCUREMENT STRATEGY. Technical / Document Library. JOC Procurement/Award Process.

Contract 100
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. The ORGANIZATION NAME Procurement Authority will authorize a Job Order (JO) for performance of work, or request additional information/changes.

Contract 100
article thumbnail

Job Order Contracting in Canada

Building Information Management

Job Order Contracting (JOC) was born of the United States military contracting world, where small construction projects were taking up to 18 months and 20 per cent of project budget to design and procure. JOC should not be used for larger construction projects where a full design process is needed.

article thumbnail

Competitive Bid Estimating for construction - A brief overview

Construction Cost Estimating

A competitive bidding process, the most prevalent procurement method, used to control construction costs for owners. In traditional design-bid-build, price is considered to be the primary factor for determining who will win the project. Construction bidding process starts with a set of contract documents.

Bidding 40
article thumbnail

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders.

Job Order Contracting

Lean Construction – Overcoming decades of mistrust, lack of communication, and opposition between facilities owners, designers, engineers, and builders… possible? Design-Bid-Build. Traditional design-bid-build (DBB) delivery process with design, bidding, and construction in separate, sequential steps.

Design 130