Remove Documentation Remove Overhead Remove Presentations Remove Profitability
article thumbnail

Job Order Contract Execution Guide – Sample Template

Job Order Contracting

The following template is provide for sample purposes only and should not be used a legally bidding document without through review and modification by appropriate Owner legal counsel. coefficient (reference table of allowable overhead). Architect/Engineer’s Guidelines, Quality Control, and other related documents in effect at.

Contract 100
article thumbnail

Job Order Contract Unit Price Book Basics

Job Order Contracting

Documenting and associated presentation of the estimate. Estimate reconciliation (if multiple estimates are required for a project).

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

“Why are bids so different?” and why your proposal document is most important when it least seems so.

Construction Marketing Ideas

A good business also adds overhead and profit to allow them to earn a decent living and the funds to service their clients. Some provided their documentation in handwritten scrawl on estimate forms. Proposal quality documentation can reach incredible extremes if you have the resources to invest in sophisticated systems.

article thumbnail

The Future of the New-Home Design Studio

Pro Builder

Who in your company is tasked with the content creation for the data loaded into digital tools, options-specific software, and hard-copy documents that communicate the design options available? It should drive higher-level option sales by presenting products in a way that heightens buyer desire and increases perceived value. .

Design 98
article thumbnail

Setting up a Job Order Contract Using Best Management Practices

Job Order Contracting

general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, sales tax and compliance with tax laws, and also contractor’s profit). a) The facilities management and/or technical staff must document the decision and plan to use a JOC. (b)

Contract 100
article thumbnail

16 Things Every Contractor Should Know When Bidding a Job Order Contract

Job Order Contracting

Specifications should be present to indicate minimal standards as the usage, materials, and content needs of the owner. it can be difficult for awarded JOC contractors to make a reasonable profit and can place undue pressure on the contractor. indicating “Per JOC Cooperative Contract”, on the appropriate document.

Bidding 100
article thumbnail

Construction Business Owner Blogs

Construction Business Owner

This seems to present a “darned-if-you-do-darned-if-you-don’t” situation. Change orders can be harder to manage – and present more of a profitability challenge – than pre-planned project work. All of a company’s overhead – office, management, and other costs – need to be rolled into the pricing.