article thumbnail

Auto Draft

FDR Safety

Finding safeguards for a specific task is challenging because a physical guard may not be feasible. OSHA AND FEASIBILITY The OSH Act is the relevant law, and OSHA standards are the relevant regulations for most employers and employees in the United States. A feasibility assessment usually takes less than an hour.

Drafting 156
article thumbnail

The Next Generation in Construction: A Spotlight on 6 Young Industry Innovators  

Autodesk Construction Cloud

In response to the Make It Modular scholarship award contest, student innovators applied design thinking skills and an engineering mindset in addressing issues like affordable housing, healthier learning environments, and Covid-era community spaces. . I hope to bring new ideas and processes into the engineering field.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Development planning is crucial in managing & implementation of construction projects since it involves selecting the technology, recognizing feasible workflows & estimating specified resources. Step 2: Draft a Preliminary Plan: Utilization of S.M.A.R.T. & Draft an initial plan: Use the S.M.A.R.T. & C.L.E.A.R.

Plans 52
article thumbnail

Fraudulent Concealment Subject to Statutory Limitations Period

Construction Lawyer

Wight hired Hanson Engineers to conduct a study of the property to assess the potential for coal mine subsidence. The letter stated in part: “The owner should consider the fact that there is no economically feasible corrective action (such as filling the mine void) that can be taken to guarantee against future subsidence.

article thumbnail

THE ESTIMATING PROCESS FROM A TO Z

Construction Cost Estimating

Building & Engineering Field Inspections 9. Engineers and consultants could also be needed for such things as steep slope foundations, downside soils (expansive clay, loose fill, peat), advanced drain problems, uncommon structural style, septic systems in environmentally sensitive areas, and so on. Pavement Cut Permit Fee 10.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. Contracting personnel and civil engineers are encouraged to adapt their SABER-like acquisitions and processes to meet their local needs and the local environment.

article thumbnail

FEATURE STORY: Racing To Be Ready – U.S. Ports Prepare for Post Panamax Era

Buisness Facilities Contributed Content

This means ports must have both a 50-foot channel depth with sufficient channel width and turning basin size, cranes capable of loading and unloading Post Panamax ships, and terminal docks engineered to handle the new, bigger cranes required for such vessels. Army Corps of Engineers Artificial Island disposal site in New Jersey.