article thumbnail

Reliance on Letter Agreement Defeats Architect’s Copyright Claim

Construction Lawyer

Some time later, the architect drafted an AIA contract which the owner marked up with various changes. If a letter agreement is to be used, have a competent construction attorney draft it so that the protections of an AIA contract can be included. The architect did not accept any of the changes and the AIA contract was never signed.

article thumbnail

What is Building Construction | Steps & Processes of Building Construction | Application of Building Construction | How to do Planning of Building Construction

CivilJungle

Are lengthy delivery equipments involved? Step 2: Draft a Preliminary Plan: Utilization of S.M.A.R.T. & The main factors affecting the standard of the project are human, equipment, materials, methods, conditions, if these factors is well controlled, the standard of construction may be guaranteed. & C.L.E.A.R.

Plans 52
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

10 Best Insulated Work Pants for Winter

Work Gearz

Synthetic softshell fabric. They are constructed from 100% cotton ripstop fabric that is built for long-lasting durability and offers a layer of protection from harmful elements when at work. Made from 100% nylon fabric, these pants come with a zippered fly and hand-warmer pockets with storm flaps. Omni-Tech, Omni-Heat.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

CAD: Cadmium, Computer-Aided Drafting. EQP: Equipment. EQPT: Equipment. EQUIP: Equipment. FAB: Fabricate. FABR: Fabricate. FBP: Fabric Panel. FF&E: Fixtures, Furnishings & Equipment. VF: Vinyl Fabric. C: Courses, Curb, Channel, Degrees Celsius, Clock Outlet, Calcimine.

article thumbnail

Revit 2017 - New Features and Enhancements

Revit OpEd

You can select draft or production quality. Generic Connections (Structure) - To facilitate the exchange of information between engineers, detailers, and fabricators about a connection between steel framing elements, Revit supports placing generic steel connections. Rendering settings are saved with each view's properties.

Revit 40
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. 00 62 89 Construction Equipment Form. 01 43 19 Fabricator Qualifications. 01 85 00 Conveying Equipment Performance Requirements. 01 87 00 Equipment and Furnishings Performance. 01 43 19 Fabricator Qualifications. 01 87 00 Equipment and Furnishings Performance.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Process Equipment Subgroup: Divisions 40 – 49. 00 62 89 Construction Equipment Form. 01 43 19 Fabricator Qualifications. 01 85 00 Conveying Equipment Performance Requirements. 01 87 00 Equipment and Furnishings Performance. 01 43 19 Fabricator Qualifications. 01 87 00 Equipment and Furnishings Performance.