article thumbnail

JOC TASK ORDER Process Overview – USACE

Job Order Contracting

Each stage in the JOC task order process is designed to assure collaboration on an early and ongoing basis, clearly communicate a detailed scope of work, and manage all aspects of construction planning, procurement, and project delivery. The government is responsible for developing the scope of work.

article thumbnail

Job Order Contracting Operations Manual

Job Order Contracting

orders and actions required by the Procurement Authority, are planned and discussed to. Procurement Authority with input from the FM team., The procurement authority and. The Contractor’s requirement for plans, sketches, shop drawings, as-builts, etc. Government provided plans, sketches, drawings etc.

Contract 100
professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Preconstruction Phase: Understanding the Process & Risks

Levelset

Architects generally refer to preconstruction simply as “design,” and break the process down into five steps: Schematic design Design development Construction documents Bidding/procurement Construction administration. These drawings give the client something to picture and provide feedback on before moving to the next stage.

Risk 52
article thumbnail

Preconstruction Meeting: A Quick Guide to Success   

Autodesk Construction Cloud

This is a chance for everyone to get to know key stakeholders, breaking down siloes between procurement and legal, scheduling and management, and so forth. Review drawings and designs one final time At the start of the meeting, all drawings and designs should exist in a state of approval.

article thumbnail

Project Foundation Pt. 1: Building the Master Schedule

Stok

Does the Client prefer to see a drawing and / or renderings? Freeze the drawings at your CD milestone and allow the estimators reasonable time to bid the project. When it comes to permitting, do not be overly optimistic. When it comes to permitting, do not be overly optimistic. Or should it be clear cut, black and white?

article thumbnail

Project Foundation Pt. 2: Building the Master Budget

Stok

This includes the architect, design engineers, project manager, and all other consultants such as Acoustical, AV, IT, Structural, Food Service, Code, Permit Expediter, Graphics / Signage, Commissioning Agent, and so on. Review the lease to see if Third Party review of drawings or Landlord oversight is the responsibility of your Client.

article thumbnail

Sealing Brick Work | Advantages of Brick Sealer | Interior Brick Sealer | Exterior Brick Sealer | How to Seal Brick Wall | Best Brick Water Repellent Sealer

CivilJungle

A sealer can be applied with a roller if no pump sprayer is procurable. Coat the complete wall and permit it to dry for some of the hours. Once the primary coat has dried, apply a second coat and permit it to dry. Some sealers can cause vignette on glass surfaces. Acrylic sealers may be the proper answer to be used on walls.