Remove Drawings Remove Permits Remove Visualization Remove Zoning
article thumbnail

Three Easy Steps to Building a Commercial Building

Wolgast Corporation

Three-Phases to Design-Build Construction: Preliminary Design and Estimating Detailed Construction Drawings and Bidding Construction Step One/Phase I – Preliminary Design and Estimating In this First Step or Phase our Architect develops plans based on a needs analysis meeting with the building owner and representatives for a nominal fee.

article thumbnail

All About Pony Wall | What Is a Pony Wall | Uses of Pony Wall | Pros and Cons of Pony Wall

CivilJungle

It provides a rigid base to join a siding and permits more wall places to hang photos. It must be hard to construct an indoor pattern image for a clear- notion surface idea from time to time, and the pony wall will apply to separate zones with many purposes for living room or dining. Also Read, How to Draw a House Plan Step by Step.

professionals

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Construction Cost Estimating Blog: BIM authorizing estimating.

Construction Cost Estimating

Building Information Modeling (BIM) generates a complete digital model of the building that can produce exact bill of material and cost estimate along with coordinated drawings and details. Innovaya Visual Estimating. Permits & Building Codes for Construction. SmartBIM QTO. Vico Cost Explorer. Blog Archive. ► 2012. (18).

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Visually inspect for corrosion. Make a visual inspection of the flue and chimney, checking for obstructions. Follow OSHA guidelines for permitting of entry and atmospheric testing of confined spaces. Follow OSHA guidelines for permitting of entry and atmospheric testing of confined spaces. Check bolt torque.

article thumbnail

Revit 2017 - New Features and Enhancements

Revit OpEd

Occlusion Culling (2016R2) - The Graphics tab in the Options dialog offers the new setting: Draw visible elements only. Display of walls - Revit will regenerate walls only for those visible within the drawing area. Calculated Values in Tags - This permits us to do the same thing to tags that we've been using in schedules.

Revit 40
article thumbnail

STATE INCENTIVES GUIDE

Buisness Facilities Contributed Content

The capital credit is used only after all other deductions, losses or credits permitted under Titles 40 and 41 of the Code of Alabama 1975. ENTERPRISE ZONE CREDIT: To stimulate growth in depressed areas of the state, Alabama offers certain tax credit incentives to business that locate or expand within a designated enterprise zone.

Income 75
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 01 15 List of Drawing Sheets. Measured Drawing Information. 00 31 43 Permit Application. 00 31 46 Permits. 00 01 15 List of Drawing Sheets. Measured Drawing Information.